Back to kitchen remodel contractors
Bing Shou Louie(Louie Bing Shou Constr)
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Oct 2025
- Last 24 months
- 1 permit filed
48 permits since 2000: 40 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2019 | Completed final sign-off Dec 2020 | 260 04th Av | to comply with 201970591; bathroom remodel replace bathtub with walk in shower replace sink & vanity add humidity fanm new lighting shall be high efficiency/led, kitchen remode-replace all cabinets & countertops flooring & wall demo no structural component replacementDetails
to comply with 201970591; bathroom remodel replace bathtub with walk in shower replace sink & vanity add humidity fanm new lighting shall be high efficiency/led, kitchen remode-replace all cabinets & countertops flooring & wall demo no structural component replacement | $50,000 |
| Jul 19, 2016 | Completed final sign-off Sep 2016 | 838 Irving St | remodel kitchen install new cabinet in the 2nd fl apt#3.Details
remodel kitchen install new cabinet in the 2nd fl apt#3. | $15,000 |
| Apr 11, 2013 | Completed final sign-off Jun 2013 | 167 17th Av | remodeling kitchen and bathroom. kitchen work in floor & cabinets. bathroom - bathtub, tiles walls & toilet work.Details
remodeling kitchen and bathroom. kitchen work in floor & cabinets. bathroom - bathtub, tiles walls & toilet work. | $7,300 |
| Apr 27, 2009 | Never finaled issued Apr 2009, no final | 809 Garfield St | change kitchen cabinet.Details
change kitchen cabinet. | $6,000 |