Back to bathroom remodel contractors
Bing Quan Li
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Jul 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 15 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 22 Huntington Dr | remodel 1 bathroom in-kind.Details
remodel 1 bathroom in-kind. | $5,000 |
| May 3, 2012 | Completed final sign-off Aug 2013 | 103 Waverly Pl | install accessible bathroomDetails
install accessible bathroom | $8,000 |
| Jul 27, 2009 | Completed final sign-off Sep 2009 | 355 21st Av | apt #3 bathroom, remove and replace toilet, bathroom fan remove and replace sink, vanity towel racks remove and replace bathroom tile and flooring remove and replace tub showerDetails
apt #3 bathroom, remove and replace toilet, bathroom fan remove and replace sink, vanity towel racks remove and replace bathroom tile and flooring remove and replace tub shower | $5,000 |