Bill Kurnizki Construction
- Based in
- Chico
- On San Francisco permits
- Aug 2004 to Jun 2015
- Last 24 months
- 0 permits filed
37 permits since 2000: 24 completed, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 5 completed, 3 never finaled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2013 | Never finaled issued Feb 2013, no final | 564 Elizabeth St | revision to 201204037440 rebuilt steps; concrete stairs cannot be seen from streetDetails
revision to 201204037440 rebuilt steps; concrete stairs cannot be seen from street | $5,000 |
| Feb 18, 2011 | Never finaled issued Mar 2011, no final | 207 Mangels Av | repair foundation, partial new slab, new stair, new doors and windows. remodel kitchen and bath on level 2. level 1, enclose garage, new study and new furnace in garage.Details
repair foundation, partial new slab, new stair, new doors and windows. remodel kitchen and bath on level 2. level 1, enclose garage, new study and new furnace in garage. | $75,000 |
| Jun 8, 2010 | Completed final sign-off Jan 2011 | 223 Tingley St | ground floor remodel to include new bedroom, office, laundry area, full bath. stair improvement, new sliding at rear. structural seismic strengthening and replacement of two columns with bearing wall.Details
ground floor remodel to include new bedroom, office, laundry area, full bath. stair improvement, new sliding at rear. structural seismic strengthening and replacement of two columns with bearing wall. | $60,000 |
| Dec 18, 2009 | Completed final sign-off Apr 2010 | 321 Judah St | 1st floor-new entry to 2nd floor, relocate stairs, new ada door to retail area, reconfigure (e) bathroom to new toilet facility, new lighting & furnace. 2nd floor-relocate stairs & infill old floor opening, new egress windows at bedroom, new water heater & furnaceDetails
1st floor-new entry to 2nd floor, relocate stairs, new ada door to retail area, reconfigure (e) bathroom to new toilet facility, new lighting & furnace. 2nd floor-relocate stairs & infill old floor opening, new egress windows at bedroom, new water heater & furnace | $40,000 |
| Feb 23, 2007 | Completed final sign-off Mar 2007 | 3364 21st St | replacing three posts on a 2 story deck/stairs. to comply with#20079896 his nov dated 02/16/07.Details
replacing three posts on a 2 story deck/stairs. to comply with#20079896 his nov dated 02/16/07. | $1,500 |
| Oct 21, 2005 | Completed final sign-off Jan 2006 | 24 Stillings Av | remove terrazo stairs. attach new supports . pour new stairs.Details
remove terrazo stairs. attach new supports . pour new stairs. | $6,500 |
| Aug 18, 2004 | Completed final sign-off Dec 2004 | 133 Nevada St | replace existing front staircase & front exterior siding.Details
replace existing front staircase & front exterior siding. | $15,000 |
| Aug 16, 2004 | Never finaled issued Aug 2004, no final | 294 Divisadero St | replace less than 50 percent of rear staircase & add stringers as neededDetails
replace less than 50 percent of rear staircase & add stringers as needed | $5,000 |