Back to kitchen remodel contractors
Big Blue Construction
- Based in
- El Cerrito
- On San Francisco permits
- Jun 2023 to Oct 2024
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2023 | Never finaled issued Jun 2023, no final | 922 Plymouth Av | remodel (e) kitchen. replace for new (e) cabinets and counter top. pull out (e) carpet and replace with new hardwood floor. replace 1' from bottom (e) shungles siding about 40 l.f. not visible from streetDetails
remodel (e) kitchen. replace for new (e) cabinets and counter top. pull out (e) carpet and replace with new hardwood floor. replace 1' from bottom (e) shungles siding about 40 l.f. not visible from street | $25,000 |