Back to kitchen remodel contractors
Bicardo Builders
- Based in
- San Rafael
- On San Francisco permits
- Jun 2006 to May 2026
- Last 24 months
- 10 permits filed
44 permits since 2000: 34 completed, 3 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 241 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2013 | Completed final sign-off Jul 2013 | 1050 North Point St | unit #501:replace tub-shower tile floors tub surround shower walls. replace shower and tub valves. replace bathroom counter tops sinks faucets, new hard wood floor. replace kitchen dishwasher. counter tops, sink, faucet. new washer dryer. kitchen & 2 bathroom remodelDetails
unit #501:replace tub-shower tile floors tub surround shower walls. replace shower and tub valves. replace bathroom counter tops sinks faucets, new hard wood floor. replace kitchen dishwasher. counter tops, sink, faucet. new washer dryer. kitchen & 2 bathroom remodel | $60,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2012 | 807 Francisco St | revision to preveious submitted & approved building permit #2007-0618-4189 modifications include interior alterations to 2nd floor partition walls. developement of new kitchen & power room within existing floor areaDetails
revision to preveious submitted & approved building permit #2007-0618-4189 modifications include interior alterations to 2nd floor partition walls. developement of new kitchen & power room within existing floor area | $27,500 |
| Apr 2, 2007 | Completed final sign-off Nov 2007 | 120 27th Av | 1 kitchen remodel, 2 bathroom, new electrical service 200 amp. new subpanel location. window not visable from street.Details
1 kitchen remodel, 2 bathroom, new electrical service 200 amp. new subpanel location. window not visable from street. | $200,000 |