Back to kitchen remodel contractors
Beyond Builders
- Based in
- San Mateo
- On San Francisco permits
- Jun 2012 to Jul 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2012 | Completed final sign-off Nov 2012 | 1145 Pine St | water damage repair and kitchen remodel. install insulation as required.Details
water damage repair and kitchen remodel. install insulation as required. | $20,000 |
| Jun 8, 2012 | Completed final sign-off Jun 2012 | 1511 Palou Av | drywall, tape, mud and texting are being applied to an existing wall in kitchen, install drywall over existing wood paneling.Details
drywall, tape, mud and texting are being applied to an existing wall in kitchen, install drywall over existing wood paneling. | $1,000 |