Back to kitchen remodel contractors
Betta Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2012 to Nov 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 30 days from filing to permit and 657 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2013 | Completed final sign-off Mar 2015 | 1948 Stockton St | kitchen, 1/2 baht, & full bath remodel, repair walls, replace electrical & plumbing, replace kitchen cabinets, countertop. min 505 total vattage of permanent lights = high efficacy @ kitchen. lighting shall be high efficacy or ocntrolled by manual on occupancy sensors @ bath.Details
kitchen, 1/2 baht, & full bath remodel, repair walls, replace electrical & plumbing, replace kitchen cabinets, countertop. min 505 total vattage of permanent lights = high efficacy @ kitchen. lighting shall be high efficacy or ocntrolled by manual on occupancy sensors @ bath. | $40,000 |
| Oct 3, 2012 | Completed final sign-off Mar 2015 | 1946 Stockton St | unit #1-remodel with creation of new master bathroom & closet. remodel (e) kitchen & bathroom in kind. new spiral stairs to new living space at ground floor, remove post at garage & upgrade foundation. structural strengthening per plansDetails
unit #1-remodel with creation of new master bathroom & closet. remodel (e) kitchen & bathroom in kind. new spiral stairs to new living space at ground floor, remove post at garage & upgrade foundation. structural strengthening per plans | $150,000 |