Permit GraphShortlistSan Francisco building permits since 2000

Bethel Construction Inc Dba Aaa Construc

Contractor license
898544
State license record
Based in
San Bruno
On San Francisco permits
Mar 2009 to Mar 2026
Last 24 months
2 permits filed

50 permits since 2000: 42 completed, 6 never finaled, 2 expired or cancelled.

Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllRoof deck 1Deck 3Stairs 14Kitchen remodel 16Bathroom remodel 18

3 deck permits: 3 completed. Typically 2 days from filing to permit and 175 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 10, 2022Completed
final sign-off Sep 2022
1227 Divisadero Streplace rear building siding approx 300 sqft. repair damaged rear deck and stair in kind. < 50% repair back yard fence 25 ft
Details
Permit
202203109707
Status
complete
Filed
Mar 10, 2022
Permit issued
Mar 11, 2022
Final sign-off
Sep 2, 2022
Declared cost
$12,000
Address
1227 Divisadero St

replace rear building siding approx 300 sqft. repair damaged rear deck and stair in kind. < 50% repair back yard fence 25 ft

Open the permit page

$12,000
Aug 21, 2019Completed
final sign-off Nov 2019
645 Santiago Strevision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck.
Details
Permit
201908219401
Status
complete
Filed
Aug 21, 2019
Permit issued
Aug 23, 2019
Final sign-off
Nov 12, 2019
Declared cost
$5,000
Address
645 Santiago St

revision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck.

Open the permit page

$5,000
Nov 2, 2016Completed
final sign-off Nov 2017
320 Garfield Strear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stair
Details
Permit
201611021715
Status
complete
Filed
Nov 2, 2016
Permit issued
Apr 27, 2017
Final sign-off
Nov 16, 2017
Declared cost
$10,000
Address
320 Garfield St

rear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stair

Open the permit page

$10,000