Back to bathroom remodel contractors
Bethel Construction Inc Dba Aaa Construc
- Based in
- San Bruno
- On San Francisco permits
- Mar 2009 to Mar 2026
- Last 24 months
- 2 permits filed
50 permits since 2000: 42 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 15 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2021 | Completed final sign-off Sep 2022 | 34 Sola Av | 1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav.Details
1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav. | $35,000 |
| May 28, 2021 | Never finaled issued May 2021, no final | 243 32nd Av | remodel kitchen 7 change 1/2 bathroom's door swing from in-swing to reverse swing at same location same size.Details
remodel kitchen 7 change 1/2 bathroom's door swing from in-swing to reverse swing at same location same size. | $14,000 |
| May 11, 2021 | Completed final sign-off Sep 2021 | 300 03rd St | kitchen remodeling & retiling bathroom floor. replacing cabinet & countertop.Details
kitchen remodeling & retiling bathroom floor. replacing cabinet & countertop. | $14,000 |
| Aug 26, 2020 | Completed final sign-off Dec 2020 | 118 Noriega St | 1st floor: kitchen and bathroom remodelingDetails
1st floor: kitchen and bathroom remodeling | $34,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2020 | 2450 Quintara St | remodel 1 kitchen and 1 bathroom. no wall movingDetails
remodel 1 kitchen and 1 bathroom. no wall moving | $25,000 |
| Jan 21, 2020 | Completed final sign-off Mar 2020 | 813 Cole St | bathroom: replace bath tub, tile, toilet, vanity, replace receptacles (gfci)Details
bathroom: replace bath tub, tile, toilet, vanity, replace receptacles (gfci) | $5,000 |
| Oct 25, 2019 | Completed final sign-off Dec 2019 | 405 Arguello Bl | in master bathroom: change tiles, remove (e) vanity cabinet and install new one at same placeDetails
in master bathroom: change tiles, remove (e) vanity cabinet and install new one at same place | $15,000 |
| Aug 26, 2019 | Completed final sign-off Feb 2022 | 321 Castro St | rearrange room layout @ 2nd flr & 3rd flr. add family rm & full bathroom at grnd flr w/ spiral stair connected to 2nd flr. extend 1 parking in front of (e) parking (interior)Details
rearrange room layout @ 2nd flr & 3rd flr. add family rm & full bathroom at grnd flr w/ spiral stair connected to 2nd flr. extend 1 parking in front of (e) parking (interior) | $120,000 |
| Apr 2, 2019 | Completed final sign-off Feb 2021 | 152 Evelyn Wy | remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facadeDetails
remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facade | $210,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 1675 Turk St | replace kitchen appliances, replace stove/microwave, remodel cabinets & kitche counter in kind. replace bathroom vanity & sink in kind. no structural work. nno wall removalDetails
replace kitchen appliances, replace stove/microwave, remodel cabinets & kitche counter in kind. replace bathroom vanity & sink in kind. no structural work. nno wall removal | $20,000 |
| Nov 10, 2017 | Completed final sign-off Jan 2018 | 1829 08th Av | bath remodel, new fixture/tiling. adding a toilet and a sink to change from one full bath to 1 and 1/2 bath on 2nd fl.Details
bath remodel, new fixture/tiling. adding a toilet and a sink to change from one full bath to 1 and 1/2 bath on 2nd fl. | $30,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2019 | 55 Sequoia Wy | infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes.Details
infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes. | $140,000 |
| Dec 29, 2016 | Expired or cancelled cancelled Oct 2022 | 44 Midcrest Wy | rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight.Details
rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight. | $170,000 |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 459 Teresita Bl | convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft.Details
convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft. | $130,000 |
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 320 Garfield St | conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area.Details
conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area. | $90,000 |
| May 31, 2016 | Completed final sign-off Jul 2016 | 118 Noriega St | to comply with # 201619991, kitchen , countertop, sink, cabinets, to be installed , floor to be tiled in bathroom & kitchen , bathroom tub vanity, sink to be replaced, & toilets, wires to be reused back door replaced & repairing stairs <50% yard ,(e) siding to be repaced, all work on top unit onlyDetails
to comply with # 201619991, kitchen , countertop, sink, cabinets, to be installed , floor to be tiled in bathroom & kitchen , bathroom tub vanity, sink to be replaced, & toilets, wires to be reused back door replaced & repairing stairs <50% yard ,(e) siding to be repaced, all work on top unit only | $18,000 |
| Oct 20, 2015 | Completed final sign-off Apr 2016 | 5934 Fulton St | develop part of gr fl non habitable space. add full bath and storage rooms. drywall existing garage. install storage cabinets, closet with hookup for washing machine.replace 3 rear windows (2 in storage room 1 in new bathroom). install (2) 20 minute rated doors.Details
develop part of gr fl non habitable space. add full bath and storage rooms. drywall existing garage. install storage cabinets, closet with hookup for washing machine.replace 3 rear windows (2 in storage room 1 in new bathroom). install (2) 20 minute rated doors. | $50,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 5934 Fulton St | repair existing bathroom water closet & tub / shower sink. drywall at brick underground plumbing, replace drywall.Details
repair existing bathroom water closet & tub / shower sink. drywall at brick underground plumbing, replace drywall. | $10,000 |