Back to kitchen remodel contractors
Berger Design Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Jun 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2009 | Completed final sign-off Dec 2009 | 36 Presidio Tr | replace drywall - replace all kitchen cabinets, addtional lighting and plugs. min. 50% of kitchen lighting wattage shall be of high efficacy lights.Details
replace drywall - replace all kitchen cabinets, addtional lighting and plugs. min. 50% of kitchen lighting wattage shall be of high efficacy lights. | $60,000 |