Back to kitchen remodel contractors
Benjamin Construction Pc
- Based in
- Richmond
- On San Francisco permits
- Mar 2010 to Dec 2015
- Last 24 months
- 0 permits filed
25 permits since 2000: 19 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 6 completed, 3 never finaled. Typically 32 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2015 | Completed final sign-off Mar 2016 | 1845 Union St | kitchen & bathroom remodeling. electrical upate and rewire. furnace replacement.Details
kitchen & bathroom remodeling. electrical upate and rewire. furnace replacement. | $25,000 |
| Jul 16, 2014 | Completed final sign-off Dec 2015 | 330 21st Av | remodelling of existimg kitchen and bathroom. no new wall and no existing wall relocation. all lighting in kitchen and bathroom remodel shall comply with cbc 150(k)8 and 150(k)10.Details
remodelling of existimg kitchen and bathroom. no new wall and no existing wall relocation. all lighting in kitchen and bathroom remodel shall comply with cbc 150(k)8 and 150(k)10. | $17,000 |
| May 1, 2014 | Completed final sign-off Jun 2017 | 114 St Marys Av | 1st floor: add 1-1/2 bathroom, convert kitchen to a wet bar. 2nd floor: add 1-1/2 bathroom, convert one bedroom to living room. add 2 dormers at attic floor.Details
1st floor: add 1-1/2 bathroom, convert kitchen to a wet bar. 2nd floor: add 1-1/2 bathroom, convert one bedroom to living room. add 2 dormers at attic floor. | $70,000 |
| Apr 16, 2014 | Never finaled issued Jun 2014, no final | 501 Crescent Av | 1st floor: total remodel, add 2 baths, 1 bedrooms,1 media room, den, office and one media room. 2nd floor:remodel kitchen and 1.5 baths. resheetrock entire dwelling, voluntary seismic whole dwellingDetails
1st floor: total remodel, add 2 baths, 1 bedrooms,1 media room, den, office and one media room. 2nd floor:remodel kitchen and 1.5 baths. resheetrock entire dwelling, voluntary seismic whole dwelling | $100,000 |
| Apr 8, 2014 | Never finaled issued May 2014, no final | 3790 Cesar Chavez St | first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl.Details
first floor: convert storage room into bedroom and full bath. new 2-4'x4' sliding wood clad windows at front. remodel 2nd floor kitchen and bath, and 3rd floor bath. convert laundry to den on 2nd fl. | $60,000 |
| Mar 27, 2013 | Completed final sign-off Jan 2014 | 718 Irving St | build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant.Details
build out kitchen, ada compliant bathroom, cosmetic alteration, removal of ceiling. change of use form retail to limited restaurant. | $100,000 |
| Nov 28, 2012 | Never finaled issued Nov 2012, no final | 373 Duncan St | #3- kitchen remodeling-4 new flourescent lights, new counter tops & cabinets replacement. replace (e) hood in kind.Details
#3- kitchen remodeling-4 new flourescent lights, new counter tops & cabinets replacement. replace (e) hood in kind. | $15,000 |
| Mar 14, 2011 | Completed final sign-off Mar 2013 | 818 Moscow St | extend kitchen, 30 sf at upper level. open partition wall beween nook and kitchen. new footing to new addition. remove e stairs on left side, new deck with patio door.Details
extend kitchen, 30 sf at upper level. open partition wall beween nook and kitchen. new footing to new addition. remove e stairs on left side, new deck with patio door. | $15,000 |
| Feb 9, 2011 | Completed final sign-off Apr 2011 | 132 Prospect Av | replacement of existing kitchen cabinets, new electrical panel (upgrade) repl of floor (kitchen ) & carpet (bedrm 1), paint kitchen & bedrm, kitchen 200 sq.ft., lighting to comply with cec 150(k)Details
replacement of existing kitchen cabinets, new electrical panel (upgrade) repl of floor (kitchen ) & carpet (bedrm 1), paint kitchen & bedrm, kitchen 200 sq.ft., lighting to comply with cec 150(k) | $10,000 |