Beale Builders & Construction
- Based in
- San Rafael
- On San Francisco permits
- Jul 2003 to Nov 2022
- Last 24 months
- 0 permits filed
56 permits since 2000: 48 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 23 days from filing to permit and 462 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2021 | Completed final sign-off Sep 2022 | 1712 Mcallister St | modify retaining wall for gas meters by creating an alcove. move stairs forward towards st. approx 15". add 36" of concrete to perimeter extg foundation wall 7' length. revision to app#202004227247.Details
modify retaining wall for gas meters by creating an alcove. move stairs forward towards st. approx 15". add 36" of concrete to perimeter extg foundation wall 7' length. revision to app#202004227247. | $5,000 |
| Apr 22, 2020 | Completed final sign-off Sep 2022 | 1712 Mcallister St | replace 30' of foundation at east side area surrounding stairs. replace 25' of foundation at west side area surrounding stairs to create a continuous foundation in the interim. ref. pa# 2017/0825/5965 & pa# 2019/1114/7337Details
replace 30' of foundation at east side area surrounding stairs. replace 25' of foundation at west side area surrounding stairs to create a continuous foundation in the interim. ref. pa# 2017/0825/5965 & pa# 2019/1114/7337 | $10,000 |
| Jun 21, 2017 | Completed final sign-off Mar 2018 | 1700 Golden Gate Av | revisions to pa 2016-0919-8083, relocate (e) shearwall @ stair entry, revise details to show new & existing work completedDetails
revisions to pa 2016-0919-8083, relocate (e) shearwall @ stair entry, revise details to show new & existing work completed | |
| Feb 29, 2012 | Completed final sign-off Sep 2012 | 1506 20th St | replace existing rear decks and stairway. reduce and replace, move stairs. build fire rated wall at east property line up against adjacent building blindwall. to comply his nov#201049526 dated 6/8/2010Details
replace existing rear decks and stairway. reduce and replace, move stairs. build fire rated wall at east property line up against adjacent building blindwall. to comply his nov#201049526 dated 6/8/2010 | $18,000 |
| May 28, 2010 | Completed final sign-off Feb 2012 | 471 Duncan St | replace "in-kind" rear yard decks, delete the stairs from the upper deck to lower deck, delete the 2 smaller stairs to side yards.Details
replace "in-kind" rear yard decks, delete the stairs from the upper deck to lower deck, delete the 2 smaller stairs to side yards. | $14,000 |