Baywood Building & Design Inc
- Based in
- Emeryville
- On San Francisco permits
- Jun 2007 to Nov 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 29 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2015 | Completed final sign-off Dec 2015 | 401 13th Ti St | bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance.Details
bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance. | $55,000 |