Back to kitchen remodel contractors
Baywest Remodeling Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2011 to Jan 2024
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2023 | Completed final sign-off Aug 2023 | 3821 Jackson St | kitchen remodel: new cabinets, countertops, appliances (replace with new appliances in same locations). no new electrical or plumbing, lighting to remain, no drywall work. replace appliances in (e) locationsDetails
kitchen remodel: new cabinets, countertops, appliances (replace with new appliances in same locations). no new electrical or plumbing, lighting to remain, no drywall work. replace appliances in (e) locations | $85,000 |
| Dec 29, 2017 | Completed final sign-off Apr 2018 | 1351 26th Av | light kitchen remodel, new cabinets added to (e), add washer/dryer to kitchen & new dishwasher, new countertop/backsplace. no framing.Details
light kitchen remodel, new cabinets added to (e), add washer/dryer to kitchen & new dishwasher, new countertop/backsplace. no framing. | $50,000 |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 314 28th St | remodel bathroom and kitchen. new electrical and plumbing, no structural alterationsDetails
remodel bathroom and kitchen. new electrical and plumbing, no structural alterations | $80,000 |
| Apr 29, 2013 | Completed final sign-off Jul 2013 | 2495 27th Av | kitchen remodel, no wall alterations, no structural, only electrical & minor plubming.Details
kitchen remodel, no wall alterations, no structural, only electrical & minor plubming. | $24,000 |
| Nov 20, 2012 | Completed final sign-off Feb 2013 | 2501 27th Av | remodel bathroom and kitchen, replace water heater and furnace, no structural alterationDetails
remodel bathroom and kitchen, replace water heater and furnace, no structural alteration | $45,000 |
| May 14, 2012 | Completed final sign-off Jun 2012 | 15 Clayton St | remodel bathroom (no electrical) tile and plumbing. alter gas line in kitchen wall. install new tankless water heater on exterior back wall. new circuits for new range hoods in 2 units. no framing, or windows. no structural.Details
remodel bathroom (no electrical) tile and plumbing. alter gas line in kitchen wall. install new tankless water heater on exterior back wall. new circuits for new range hoods in 2 units. no framing, or windows. no structural. | $10,000 |
| Mar 5, 2012 | Completed final sign-off Feb 2013 | 2647 37th Av | remodel kitchen & bathroom: electrical & plumbing seperate permits. replace 1 small window in bath, more than 5' from property line, high efficacy lighting.Details
remodel kitchen & bathroom: electrical & plumbing seperate permits. replace 1 small window in bath, more than 5' from property line, high efficacy lighting. | $40,000 |
| Nov 7, 2011 | Completed final sign-off Dec 2011 | 529 Duboce Av | remodel apt kitchen and bathroom electrical and plumbign done by sub-contractors under separate permits no structural changes, change out 2 windows (1 kitchen & 1 bathroom) by inserts, backside of buildingDetails
remodel apt kitchen and bathroom electrical and plumbign done by sub-contractors under separate permits no structural changes, change out 2 windows (1 kitchen & 1 bathroom) by inserts, backside of building | $27,000 |