Bayview Construction
- Based in
- Burlingame
- On San Francisco permits
- Jul 2005 to Aug 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 792 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2010 | Expired or cancelled expired Jan 2015 | 729 Kirkwood Av | revision to pa# 2007.03.20.6741(r2) consisting of removal/replacement with (n) accessible & code compliant ramp & stair, (n) site drainage system, (n) exterior ramp to play area. finishes, (n) exterior lighting and accessible drinking fountain, (n) sidewalk/curb w/ paving & curb cuts @ kirkwood ave.Details
revision to pa# 2007.03.20.6741(r2) consisting of removal/replacement with (n) accessible & code compliant ramp & stair, (n) site drainage system, (n) exterior ramp to play area. finishes, (n) exterior lighting and accessible drinking fountain, (n) sidewalk/curb w/ paving & curb cuts @ kirkwood ave. | $150,000 |