Back to bathroom remodel contractors
Bayside Mechanical Inc
- Based in
- Foster City
- On San Francisco permits
- Jun 2005 to Sep 2026
- Last 24 months
- 5 permits filed
48 permits since 2000: 34 completed, 1 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 2 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2018 | Never finaled issued Jun 2018, no final | 8 Octavia St | install 1 - 4 ton split system with duct and diffusors and run new lineset between fan coil and condesing units, install thermostat, 1 bathroom exhaust fanDetails
install 1 - 4 ton split system with duct and diffusors and run new lineset between fan coil and condesing units, install thermostat, 1 bathroom exhaust fan | $20,000 |
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 760 Harrison St | revision to 201404102920: extension of copy file room, relocate fire larm, install speaker at main reception window. new security chain link fence across the basement with lockset, relocate 2 wing walls at open offices. new finyl plank flooring. delete bathroom at wellness centerDetails
revision to 201404102920: extension of copy file room, relocate fire larm, install speaker at main reception window. new security chain link fence across the basement with lockset, relocate 2 wing walls at open offices. new finyl plank flooring. delete bathroom at wellness center | |
| Apr 17, 2008 | Completed final sign-off Oct 2008 | 200 Industrial St | install two 200,000 btu unit heaters and two bathroom exhaust fansDetails
install two 200,000 btu unit heaters and two bathroom exhaust fans | $9,800 |