Back to kitchen remodel contractors
Bay West Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Jan 2016
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2016 | Completed final sign-off Jul 2016 | 645 Euclid Av | unit #3 remodel kitchen & bathroom. remove lath & plaster, tile work, etc. insulate & install new sheetrock, cabinets, counter tops, new tile work, etc. no structural work. plumbing & electrical by others.Details
unit #3 remodel kitchen & bathroom. remove lath & plaster, tile work, etc. insulate & install new sheetrock, cabinets, counter tops, new tile work, etc. no structural work. plumbing & electrical by others. | $50,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 645 Euclid Av | unit 1: remodel kitchen & bathroom, remove wall coverings, tile, etc., install new cabinets, plumbing fixtures, tile work. no structural work, plumbing & electrical by others.Details
unit 1: remodel kitchen & bathroom, remove wall coverings, tile, etc., install new cabinets, plumbing fixtures, tile work. no structural work, plumbing & electrical by others. | $50,000 |
| Jun 20, 2011 | Completed final sign-off Sep 2011 | 527 Duboce Av | remodel kitchen, bathroom,hall/plmg, electrical by subcontractor at unit #1. no structural work. no wall relocation. new lighting comply with cec 150Details
remodel kitchen, bathroom,hall/plmg, electrical by subcontractor at unit #1. no structural work. no wall relocation. new lighting comply with cec 150 | $39,000 |
| Sep 24, 2010 | Completed final sign-off Jan 2011 | 1471 35th Av | kitchen remodel: (n) countertops, cabinets & plumbing fixtures. replace in-kind. min 50% of kitchen lighting wattage to be high efficency fixture.Details
kitchen remodel: (n) countertops, cabinets & plumbing fixtures. replace in-kind. min 50% of kitchen lighting wattage to be high efficency fixture. | $45,000 |
| Jun 21, 2010 | Completed final sign-off Sep 2010 | 1638 Irving St | demo at kitchen & shower surround (1 kitchen & 1 bath). replace ktichen cabients, sink, counter & fixture, replace shower surround & sink, replace gyp board & paint as necessary, no structural modifications (no new wall & no existing wall relocation).Details
demo at kitchen & shower surround (1 kitchen & 1 bath). replace ktichen cabients, sink, counter & fixture, replace shower surround & sink, replace gyp board & paint as necessary, no structural modifications (no new wall & no existing wall relocation). | $25,000 |