Back to kitchen remodel contractors
Bay Remodels
- Based in
- Pcifica
- On San Francisco permits
- Jun 2018 to Sep 2025
- Last 24 months
- 2 permits filed
17 permits since 2000: 9 completed, 3 in progress, 5 never finaled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 1 in progress, 1 never finaled. Typically 12 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2024 | In progress issued Jul 2024 | 116 San Aleso Av | voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchenDetails
voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchen | $30,000 |
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 116 San Aleso Av | renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes).Details
renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes). | $300,000 |
| Jun 29, 2022 | Completed final sign-off Jan 2024 | 2367 37th Av | renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall.Details
renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall. | $150,000 |
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 224 Scott St | kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2Details
kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2 | $43,000 |
| Dec 23, 2020 | Completed final sign-off Jul 2022 | 78 Stanyan St | remodel (e) kitchen & two (e) bathrooms. remove walls for new plan configuration. add washer & dryer in the unit.Details
remodel (e) kitchen & two (e) bathrooms. remove walls for new plan configuration. add washer & dryer in the unit. | $85,000 |
| Oct 31, 2018 | Completed final sign-off Jun 2019 | 432 Hugo St | remodel (e) kitchen & bathroom at unit 432, remove spiral stair to lower level, replace with (n) stairway. create master bedroom at existing lower level.Details
remodel (e) kitchen & bathroom at unit 432, remove spiral stair to lower level, replace with (n) stairway. create master bedroom at existing lower level. | $100,000 |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 2999 California St | unit #65: kitchen and bathroom remodel, remove 4 walls and add 3 new wallsDetails
unit #65: kitchen and bathroom remodel, remove 4 walls and add 3 new walls | $10,000 |
| Jun 11, 2018 | Completed final sign-off Sep 2018 | 165 Ripley St | remodel 1 kitchen & remodel 1 bathroom. k: new exhaust fan, r/r cabinets, countertop,sink ,new can lights. b: new tilet, new sink, new tilet, new can lights. no change in walls, openings or layout.Details
remodel 1 kitchen & remodel 1 bathroom. k: new exhaust fan, r/r cabinets, countertop,sink ,new can lights. b: new tilet, new sink, new tilet, new can lights. no change in walls, openings or layout. | $25,000 |