Bay Quality Construction Inc
- Based in
- San Ramon
- On San Francisco permits
- May 2024 to May 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 23 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2024 | Completed final sign-off Feb 2025 | 449 Teresita Bl | demo (e) covered landing and stairs at rear of building, alteration of (e) rear elecation to include installation of a (n) sliding glass door. replace (2) sliding windows. construction of (n) 9'.9" tall deck at rear, built from property line to proerty line and projecting 11'-8" from the rear of theDetails
demo (e) covered landing and stairs at rear of building, alteration of (e) rear elecation to include installation of a (n) sliding glass door. replace (2) sliding windows. construction of (n) 9'.9" tall deck at rear, built from property line to proerty line and projecting 11'-8" from the rear of the | $20,000 |