Back to kitchen remodel contractors
Bay Home Remodeling
- Based in
- Orinda
- On San Francisco permits
- Nov 2018 to Mar 2026
- Last 24 months
- 9 permits filed
42 permits since 2000: 32 completed, 4 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 11 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2025 | In progress issued Jul 2025 | 2105 Buchanan St | kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insertDetails
kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insert | $220,000 |
| Apr 24, 2025 | In progress issued Aug 2025 | 3845 26th St | horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windowsDetails
horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windows | $501,000 |
| Aug 21, 2024 | Completed final sign-off Mar 2025 | 431 Morse St | kitchen remodelDetails
kitchen remodel | $30,000 |
| Jul 31, 2024 | Completed final sign-off Dec 2024 | 2105 Buchanan St | unit #6- kitchen remodel (stove/ hood relocation) primary & secondary bathroom remodel. washer dryer relocation. convert (e) wood fireplace to gas fireplace. (n) skylights. minor wall layout change (non structural) (n) subpanelDetails
unit #6- kitchen remodel (stove/ hood relocation) primary & secondary bathroom remodel. washer dryer relocation. convert (e) wood fireplace to gas fireplace. (n) skylights. minor wall layout change (non structural) (n) subpanel | $200,000 |
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 187 Hamerton Av | kitchen remodel with structural layout change, bathroom remodel in-kind, masterbath remodel with layout changes, removal of window.Details
kitchen remodel with structural layout change, bathroom remodel in-kind, masterbath remodel with layout changes, removal of window. | $177,000 |
| Mar 28, 2023 | Expired or cancelled cancelled Jan 2026 | 75 Jersey St | revision to 202205265041.kitchen remodel, ex elec sub panel to be relocated, e kitchen windows to be replaced in kind. same opening. e bath windows to be replaced.Details
revision to 202205265041.kitchen remodel, ex elec sub panel to be relocated, e kitchen windows to be replaced in kind. same opening. e bath windows to be replaced. | $10,000 |
| May 26, 2022 | Never finaled issued Apr 2023, no final | 75 Jersey St | bathroom remodel. 2 new skylights. kitchen remodel. 3 window replacementDetails
bathroom remodel. 2 new skylights. kitchen remodel. 3 window replacement | $20,000 |
| May 24, 2021 | Never finaled issued May 2021, no final | 2538 Lake St | 2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation.Details
2 bathroom remodel & 1 kitchen. replace all appliances, replace hood, replace plumbing fixtures. 16 windows ufactor 0.30 or better.replace back and side of the house. full electrical upgrade, new panel. update mep up to code. remove all plaster wall and replace with sheetrock & insulation. | $75,000 |
| Apr 28, 2021 | Completed final sign-off Apr 2024 | 866 Brussels St | add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bathDetails
add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bath | $200,000 |
| Apr 9, 2021 | Completed final sign-off Oct 2022 | 6 Ora Wy | no new all & no existing wall relocation. 2 bathrooms remodel like for like, no walls or layout change. master shower to shower, guest tub to tub. kitchen remodel oke for lke. new lighitng shall comnply with cec 150 .0 (k).Details
no new all & no existing wall relocation. 2 bathrooms remodel like for like, no walls or layout change. master shower to shower, guest tub to tub. kitchen remodel oke for lke. new lighitng shall comnply with cec 150 .0 (k). | $30,000 |
| Jan 14, 2021 | Completed final sign-off Jun 2021 | 1432 38th Av | kitchen remodel like for like, replace r.l.adding outlet up to code.3-4 underilghts cabinet, replace garden/bay window not visible from st. replacing panel like for ilke 125 amp. master bath remodeling like for like,replace shower with tub,plumbing,fixtures,4-6 r.l. new fan upgrade e/m/p up to code.Details
kitchen remodel like for like, replace r.l.adding outlet up to code.3-4 underilghts cabinet, replace garden/bay window not visible from st. replacing panel like for ilke 125 amp. master bath remodeling like for like,replace shower with tub,plumbing,fixtures,4-6 r.l. new fan upgrade e/m/p up to code. | $34,000 |
| Dec 3, 2020 | Completed final sign-off Jun 2021 | 253 Central Av | kitchen & bathroom remodel like for like. raplace all appliances and plumb fixtures at kitchen. add recess lts. replace all bath fixtures, 2 recess lts. replace fan. upgrade elect, plumb, mech to code. replace windows-not visible from street.Details
kitchen & bathroom remodel like for like. raplace all appliances and plumb fixtures at kitchen. add recess lts. replace all bath fixtures, 2 recess lts. replace fan. upgrade elect, plumb, mech to code. replace windows-not visible from street. | $32,000 |
| Dec 3, 2020 | Completed final sign-off Jun 2021 | 87 Cuvier St | kitchen and bathroom remodel, like for likeDetails
kitchen and bathroom remodel, like for like | $32,000 |
| Oct 22, 2020 | Completed final sign-off Feb 2021 | 157 Hernandez Av | complete kitchen and bathroom remodel like for like. electrical panel upgrade to 24 breakersDetails
complete kitchen and bathroom remodel like for like. electrical panel upgrade to 24 breakers | $50,000 |
| Oct 6, 2020 | Never finaled issued Oct 2020, no final | 1735 35th Av | complete kitchen and bathroms upstairs remodel like for like(shower pan) no walls/layout change. roof 1100 sq ft of flat reroof & 400 sq ft of pitched roof. replace electic panel to 24 breakers.Details
complete kitchen and bathroms upstairs remodel like for like(shower pan) no walls/layout change. roof 1100 sq ft of flat reroof & 400 sq ft of pitched roof. replace electic panel to 24 breakers. | $45,000 |
| Aug 17, 2020 | Completed final sign-off Dec 2020 | 798 Elizabeth St | 1st floor, garage below; aprx. 120 sq. ft; upgrade plumbing in the kitchen; install new hood and fan; ventilation; upgrade electricity to code; gfci outlets; recessed lighting; new kitchen cabinets, molding trim and baseboards; new countertop; install backsplash and grout; connect applicances; paintDetails
1st floor, garage below; aprx. 120 sq. ft; upgrade plumbing in the kitchen; install new hood and fan; ventilation; upgrade electricity to code; gfci outlets; recessed lighting; new kitchen cabinets, molding trim and baseboards; new countertop; install backsplash and grout; connect applicances; paint | $30,000 |
| Sep 11, 2019 | Completed final sign-off Dec 2019 | 1258 Stanyan St | kitchen remodel- "face to face" kitchen moving the sink and fridge to the other side. stove and hood stay in the same location. replacing existing light fixtures. upgrade sub panel to a bigger box and 220. in kind kitchen remodel.Details
kitchen remodel- "face to face" kitchen moving the sink and fridge to the other side. stove and hood stay in the same location. replacing existing light fixtures. upgrade sub panel to a bigger box and 220. in kind kitchen remodel. | $30,000 |