Back to kitchen remodel contractors
Bay East Construction
- Based in
- Hayward
- On San Francisco permits
- Feb 2015 to Jul 2023
- Last 24 months
- 0 permits filed
11 permits since 2000: 7 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2019 | Expired or cancelled expired Feb 2025 | 1000 Mason St | unit #104 - kitchen remodelDetails
unit #104 - kitchen remodel | $18,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 1558 Church St | bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensorDetails
bathroom. kitchen and laundry room remodel no change on walls. all new lighting are leds at least 30" clearance btw cabinet & cook top. laundry room light to be controlled by occuoancy sensor | $130,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 1827 42nd Av | will be changing the old cabinets with new ones at kitchen, 6 new led lights, and new tile floor. no alteration of wall , window and door.Details
will be changing the old cabinets with new ones at kitchen, 6 new led lights, and new tile floor. no alteration of wall , window and door. | $20,000 |
| Mar 4, 2016 | Completed final sign-off Jun 2016 | 1860 24th Av | kitchen/bath remodel. demo of common frame walls(no load bearing) common framing for new (build new interior walls)Details
kitchen/bath remodel. demo of common frame walls(no load bearing) common framing for new (build new interior walls) | $95,000 |
| Jun 25, 2015 | Completed final sign-off Nov 2015 | 2400 Divisadero St | replace cabinets, move clothes, dryer to opposite walking kitchen. upgrade kitchen, electrical to current code. all work in kitchen area only.Details
replace cabinets, move clothes, dryer to opposite walking kitchen. upgrade kitchen, electrical to current code. all work in kitchen area only. | $18,000 |
| Feb 25, 2015 | Completed final sign-off Dec 2015 | 30 Stanford Heights Av | install recessed lights in living room and kitchen (12). install (3) 20 amp sm appliance branch circuits. install dedicaed circuits for garbage disposal, microwave, dishwasher, refridgerator. provide 30 amp dedicated branch circuits in laundry rm. provide 1 dedicated circuit for bathroom - tub jetsDetails
install recessed lights in living room and kitchen (12). install (3) 20 amp sm appliance branch circuits. install dedicaed circuits for garbage disposal, microwave, dishwasher, refridgerator. provide 30 amp dedicated branch circuits in laundry rm. provide 1 dedicated circuit for bathroom - tub jets | $42,000 |