Bay County Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to Sep 2026
- Last 24 months
- 15 permits filed
55 permits since 2000: 13 completed, 14 in progress, 22 never finaled, 6 expired or cancelled.
Of the 22 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
10 stairs permits: 4 completed, 1 in progress, 5 never finaled. Typically 30 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2026 | In progress issued Mar 2026 | 139 Kingston St | remove unauth. enclosed space under rear stairs,comply nov201991811.remove unauthorized walls,doors,bath in garage,comply nov202185249,202185258.install handrails,repair rear stairs in kind less than 50%,comply 202185165.get plumbing permit,make code correction for water heater furnace nov202184899.Details
remove unauth. enclosed space under rear stairs,comply nov201991811.remove unauthorized walls,doors,bath in garage,comply nov202185249,202185258.install handrails,repair rear stairs in kind less than 50%,comply 202185165.get plumbing permit,make code correction for water heater furnace nov202184899. | $5,000 |
| Jan 20, 2026 | Completed final sign-off Mar 2026 | 30 Hernandez Av | install tile for front stairs. no structural work. replace front stucco.Details
install tile for front stairs. no structural work. replace front stucco. | $3,000 |
| Aug 24, 2022 | Never finaled issued Mar 2023, no final | 1157 Capp St | comply with complaint 202293085. replace front and rear stairs.Details
comply with complaint 202293085. replace front and rear stairs. | $25,000 |
| Aug 23, 2022 | Never finaled issued Aug 2022, no final | 1519 Jennings St | replace rear siding with hardie board. replace like ind windows (3) on side and rear. not visible from street. repair rear stairs less than 50%. windows same size, same locations, max u-factor 0.30.Details
replace rear siding with hardie board. replace like ind windows (3) on side and rear. not visible from street. repair rear stairs less than 50%. windows same size, same locations, max u-factor 0.30. | $15,000 |
| Oct 19, 2021 | Completed final sign-off Jul 2022 | 1519 Revere Av | repair rear stairway with handrail & side corridor. both repair less than 50%. change rear siding with hardie board, rear windows (6) & rear door. not visible from street. remove living rm fire place, close opening between living/dining room. no structural work. repair water heater, furnace, laundryDetails
repair rear stairway with handrail & side corridor. both repair less than 50%. change rear siding with hardie board, rear windows (6) & rear door. not visible from street. remove living rm fire place, close opening between living/dining room. no structural work. repair water heater, furnace, laundry | $25,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2026 | 66 Delano Av | 1/f-infill at rear, add family room, master bedroom, 1 bedroom and 2 bath. 2/f-remodel kitchen and bath, add 1 full bath, interior stairs and roof deck at rear. convert attic to 3/f; add 1 bedroom, 1 full bath and roof deck at rear. replace front windows in kind with aluminum clad wood.Details
1/f-infill at rear, add family room, master bedroom, 1 bedroom and 2 bath. 2/f-remodel kitchen and bath, add 1 full bath, interior stairs and roof deck at rear. convert attic to 3/f; add 1 bedroom, 1 full bath and roof deck at rear. replace front windows in kind with aluminum clad wood. | $140,000 |
| Oct 1, 2019 | Completed final sign-off Dec 2020 | 119 Stillings Av | revision to pa 2016-0104-6318 to reconfigure room layout @ 2nd floor & replace (e) interior stair; replace (e) front windows with new. match (e) like kind & size (in compliance with nov 201942772)Details
revision to pa 2016-0104-6318 to reconfigure room layout @ 2nd floor & replace (e) interior stair; replace (e) front windows with new. match (e) like kind & size (in compliance with nov 201942772) | $30,000 |
| Apr 23, 2019 | Never finaled issued May 2019, no final | 977 Oak St | 1/f: relocate kitchen, remodel bath, and add 1 bedroom & bathroom. 2nd fl: relocate kitchen & living, remodel bath. add 1 bedroom, bath & laundry. reconfigure existing stairs. alter windows on the side & rear.Details
1/f: relocate kitchen, remodel bath, and add 1 bedroom & bathroom. 2nd fl: relocate kitchen & living, remodel bath. add 1 bedroom, bath & laundry. reconfigure existing stairs. alter windows on the side & rear. | $75,000 |
| May 3, 2018 | Never finaled issued May 2018, no final | 19 Edna St | repair front exterior stairs. stair repair less than 50%. upgrade electrical panel.Details
repair front exterior stairs. stair repair less than 50%. upgrade electrical panel. | $5,000 |
| Feb 22, 2018 | Never finaled issued Feb 2020, no final | 1272 Fitzgerald Av | legalize (1) unit @ 2nd fl as an adu per ord# 162-16. comply w/ nov #201569684, #201569121. add one unit on 1st flr under seperate permit#2015-1215-5191 per ord# 43-14. legalize 2nd flr rear dack and stairs.Details
legalize (1) unit @ 2nd fl as an adu per ord# 162-16. comply w/ nov #201569684, #201569121. add one unit on 1st flr under seperate permit#2015-1215-5191 per ord# 43-14. legalize 2nd flr rear dack and stairs. | $10,000 |