Back to bathroom remodel contractors
Bay Counties Electric & Const.
- Based in
- Daly City
- On San Francisco permits
- Oct 2009 to Jul 2014
- Last 24 months
- 0 permits filed
44 permits since 2000: 34 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 14 completed, 5 expired or cancelled. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 28, 2013 | Completed final sign-off Dec 2013 | 2396 Pine St | work in unit 205: kitchen and bath remodel. replace cabinets and fixtures in kind. no structural work.Details
work in unit 205: kitchen and bath remodel. replace cabinets and fixtures in kind. no structural work. | $20,000 |
| Jul 24, 2013 | Expired or cancelled expired Mar 2016 | 550 14th St | #104 & #105- remodel kitchen & bath, replace cabinets in kind, rewire unit, lighting to comply to title 24. lighting to comply with cec 150(k)Details
#104 & #105- remodel kitchen & bath, replace cabinets in kind, rewire unit, lighting to comply to title 24. lighting to comply with cec 150(k) | $70,000 |
| Jun 14, 2013 | Completed final sign-off Dec 2013 | 1885 Jackson St | unit #401:replace cabinets in kitchen. replace tiles in 2 bathrooms. no other alterations. cosmetic only.Details
unit #401:replace cabinets in kitchen. replace tiles in 2 bathrooms. no other alterations. cosmetic only. | $30,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 186 10th Av | kitchen & bath remodel, replace cabinet in kind, install vent in bathroom, no structural work.Details
kitchen & bath remodel, replace cabinet in kind, install vent in bathroom, no structural work. | $20,000 |
| Apr 15, 2013 | Completed final sign-off Oct 2013 | 2275 Jackson St | unit #1: kitchen and bath remodel, repl cabinets in kind, upgrade electrical throughout lighting to comply to t-24, no alteration of partition wall framingDetails
unit #1: kitchen and bath remodel, repl cabinets in kind, upgrade electrical throughout lighting to comply to t-24, no alteration of partition wall framing | $40,000 |
| Jan 15, 2013 | Completed final sign-off Mar 2013 | 140 Steiner St | #6: replace kitchen cabinets, dishwasher and sink. install bathroom exhaust fan. electrical upgrade at kitchen and bath. install sub-panel.Details
#6: replace kitchen cabinets, dishwasher and sink. install bathroom exhaust fan. electrical upgrade at kitchen and bath. install sub-panel. | $20,000 |
| Dec 31, 2012 | Expired or cancelled expired Dec 2014 | 2275 Jackson St | work in unit #7: kitchen and bath remodel, replace cabinets in kind, lighting to comply to title 24, upgrade electrical throughout unit, no structural work or wall removal. no windows, no doors on this permit.Details
work in unit #7: kitchen and bath remodel, replace cabinets in kind, lighting to comply to title 24, upgrade electrical throughout unit, no structural work or wall removal. no windows, no doors on this permit. | $40,000 |
| Oct 12, 2012 | Completed final sign-off Feb 2013 | 2275 Jackson St | kitchen and bath remodel. replace cabinets in kind. lighting to conform to title 24. unit #8 on 3rd floorDetails
kitchen and bath remodel. replace cabinets in kind. lighting to conform to title 24. unit #8 on 3rd floor | $30,000 |
| Oct 2, 2012 | Expired or cancelled expired Sep 2017 | 2038 Balboa St | legalize bathroom at ground floorDetails
legalize bathroom at ground floor | $10,000 |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 15 Forest Side Av | bathroom remodel in-kind, remove & replace plaster @ 2-bedrooms w/ gypsum board. remodel closet by bathroom.Details
bathroom remodel in-kind, remove & replace plaster @ 2-bedrooms w/ gypsum board. remodel closet by bathroom. | $12,000 |
| Jul 16, 2012 | Completed final sign-off Sep 2012 | 2015 Laguna St | unit #10-1 kitchen & 1 bathroom remodel, replace in kind.Details
unit #10-1 kitchen & 1 bathroom remodel, replace in kind. | $40,000 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 2042 Balboa St | 1-kitchen, 2-bathrooms remodel & 1-electrical panel upgrade.Details
1-kitchen, 2-bathrooms remodel & 1-electrical panel upgrade. | $40,000 |
| Dec 14, 2011 | Completed final sign-off May 2012 | 2275 Jackson St | unit # 2: remodel in-kind of bathroom & kitchen (non-structual). install exhaust fan in bathroom and vent up to and past the roof line through lightwell. no penetration into other units. lighting shall comply with cec 150 (k)Details
unit # 2: remodel in-kind of bathroom & kitchen (non-structual). install exhaust fan in bathroom and vent up to and past the roof line through lightwell. no penetration into other units. lighting shall comply with cec 150 (k) | $30,000 |
| Apr 25, 2011 | Expired or cancelled expired Dec 2014 | 2015 Laguna St | unit#2: kitchen & bath remodel, replace cabinets and fixtures in-kind.Details
unit#2: kitchen & bath remodel, replace cabinets and fixtures in-kind. | $40,000 |
| Dec 10, 2010 | Completed final sign-off May 2011 | 239 Judah St | reconfige bathroom @ 2nd. flr. with the same space.Details
reconfige bathroom @ 2nd. flr. with the same space. | $9,000 |
| Nov 17, 2010 | Expired or cancelled expired Mar 2013 | 1901 Carroll Av | install (n) catering kitchen within (e) warehouse space. barrier removal; convert (e) bathroom to unisex handicapped bath as per plan. mep under separate permit.Details
install (n) catering kitchen within (e) warehouse space. barrier removal; convert (e) bathroom to unisex handicapped bath as per plan. mep under separate permit. | $35,000 |
| Mar 22, 2010 | Completed final sign-off Jul 2010 | 2015 Laguna St | unit #12 - kitchen remodel: replace in kind - cabients, sink, dishwasher. bathroom remodel: repalce in kind-tub, toilet, vanity. upgrade elctrical- new subpanel.Details
unit #12 - kitchen remodel: replace in kind - cabients, sink, dishwasher. bathroom remodel: repalce in kind-tub, toilet, vanity. upgrade elctrical- new subpanel. | $40,000 |
| Dec 23, 2009 | Completed final sign-off Jun 2010 | 2015 Laguna St | unit # 11: remodel kitchen: replace in kind. install new cabinets, sink, dishwasher. min. 50% of kitchen light watt in h.e. in kitchen. remodel bathroom: replace in kind, install new tubs, toilet sink - h.e. lights or o.s. in bath.Details
unit # 11: remodel kitchen: replace in kind. install new cabinets, sink, dishwasher. min. 50% of kitchen light watt in h.e. in kitchen. remodel bathroom: replace in kind, install new tubs, toilet sink - h.e. lights or o.s. in bath. | $40,000 |
| Nov 23, 2009 | Completed final sign-off Mar 2010 | 630 Mason St | kitchen remodel: repl kitchen cabinets/counter tops, bathroom remodel: replace vanity, shower valve at shower stall, add shower to existing tub, no structural work, new lighting, unit #702 onlyDetails
kitchen remodel: repl kitchen cabinets/counter tops, bathroom remodel: replace vanity, shower valve at shower stall, add shower to existing tub, no structural work, new lighting, unit #702 only | $40,000 |