Bay Concrete Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2019
- Last 24 months
- 0 permits filed
87 permits since 2000: 59 completed, 6 never finaled, 22 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2019 | Never finaled issued Jan 2023, no final | 1359 12th Av | change bldg rear footprint to conform to zoning administrator bulletin #5 (12 ft pop out). add stair for garden access. add sun room and deck at top floor. new dwelling unit per zoning.Details
change bldg rear footprint to conform to zoning administrator bulletin #5 (12 ft pop out). add stair for garden access. add sun room and deck at top floor. new dwelling unit per zoning. | $77,000 |
| May 5, 2014 | Completed final sign-off Jun 2014 | 336 Day St | replace front wood stairs in kind. no change to foot print or dimensions. less than 50% of front staircase structure. street space.Details
replace front wood stairs in kind. no change to foot print or dimensions. less than 50% of front staircase structure. street space. | $9,700 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 120 London St | as-built plans for original permit application #2007/0926/3714. change from original plans 2-steps between family room & study, sheet a100 & maximum stair riser from 8" to 7" on stair detail sheet a200.Details
as-built plans for original permit application #2007/0926/3714. change from original plans 2-steps between family room & study, sheet a100 & maximum stair riser from 8" to 7" on stair detail sheet a200. | |
| Mar 4, 2003 | Completed final sign-off May 2003 | 1459 Clayton St | replace concrete front stairs and retaining wallDetails
replace concrete front stairs and retaining wall | $12,000 |