Bay Concept Builder Group
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Apr 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 1 completed, 3 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 completed, 2 in progress, 1 never finaled. Typically 176 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2025 | In progress issued Dec 2025 | 2334 Francisco St | full remodel with new kitchens and bathrooms. remodel (e) 1/f to new living space for 2/f unit with new interior stairs. 1-story rear addition for 2/f unit and turn new roof to roof deck. new cantilever deck for 3/f unit as open space.Details
full remodel with new kitchens and bathrooms. remodel (e) 1/f to new living space for 2/f unit with new interior stairs. 1-story rear addition for 2/f unit and turn new roof to roof deck. new cantilever deck for 3/f unit as open space. | $535,000 |
| Apr 19, 2023 | In progress issued Apr 2026 | 278 18th Av | 2-unit remodel w/horizontal addition at rear. remodeled g/f unit consist of bedrms, 1 full bath, & 1 half bath, & an open living/dining/kitchen. 2nd unit on 2/f & 3/f consist of an open living/dining/kitchen & a guest bath w/access to balcony deck @2/f. 3/f: master bedrm, bath, 2 bedrm, 1 full bath.Details
2-unit remodel w/horizontal addition at rear. remodeled g/f unit consist of bedrms, 1 full bath, & 1 half bath, & an open living/dining/kitchen. 2nd unit on 2/f & 3/f consist of an open living/dining/kitchen & a guest bath w/access to balcony deck @2/f. 3/f: master bedrm, bath, 2 bedrm, 1 full bath. | $800,000 |
| Feb 13, 2017 | Completed final sign-off Jul 2017 | 51 West View Av | relocate (e) kitchen, add one new bath room & convert kitchen space to bedroom at second floor; construct 1 bedroom, family room & 1 full bath at ground floor; construct new deck at rear of bldg (size approx. 18'x7'-0"). maher naDetails
relocate (e) kitchen, add one new bath room & convert kitchen space to bedroom at second floor; construct 1 bedroom, family room & 1 full bath at ground floor; construct new deck at rear of bldg (size approx. 18'x7'-0"). maher na | $58,000 |
| Sep 28, 2016 | Never finaled issued Mar 2017, no final | 866 27th Av | revision to pa 2015-0625-9931 to revise scope of work. 2nd floor to relocate kitchen, add a bedroom, add game room, remodel (e) bathrooms; 1st floor to relocate bathrooms. all work is less than 75% of the existing.Details
revision to pa 2015-0625-9931 to revise scope of work. 2nd floor to relocate kitchen, add a bedroom, add game room, remodel (e) bathrooms; 1st floor to relocate bathrooms. all work is less than 75% of the existing. | $30,000 |