Bay City Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Apr 2019
- Last 24 months
- 0 permits filed
62 permits since 2000: 46 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2017 | Completed final sign-off Jul 2017 | 71 Delmar St | repair 30% in kind materials, rear deck . 6x6 pt/ 2x12 stringers/4x4 post guard rail and deck surface.Details
repair 30% in kind materials, rear deck . 6x6 pt/ 2x12 stringers/4x4 post guard rail and deck surface. | $7,000 |
| Apr 27, 2017 | Never finaled issued Apr 2017, no final | 930 Darien Wy | repair to exterior deck 50% in-kind. replace materials like with like materials.Details
repair to exterior deck 50% in-kind. replace materials like with like materials. | $3,700 |
| Aug 17, 2016 | Completed final sign-off Mar 2017 | 18 Cadell Pl | replace (2) exterior patio/deck surface with westcoat alx coating system. approximately 150 sq. ft.Details
replace (2) exterior patio/deck surface with westcoat alx coating system. approximately 150 sq. ft. | $10,000 |
| Mar 27, 2012 | Completed final sign-off Aug 2012 | 765 Brussels St | repairs to rear deck less than 50% of existing.Details
repairs to rear deck less than 50% of existing. | $400 |