Back to bathroom remodel contractors
Bay City Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Apr 2019
- Last 24 months
- 0 permits filed
62 permits since 2000: 46 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 4 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2019 | Expired or cancelled cancelled Sep 2019 | 250 Point Lobos Av | apt 302: remodel kitchen and bathroom. all fixtures will be in same location.Details
apt 302: remodel kitchen and bathroom. all fixtures will be in same location. | $25,000 |
| Apr 29, 2019 | Completed final sign-off Nov 2019 | 1090 Eddy St | apt 106: remodel kitchen and bathroom. all fixtures will be in same location.Details
apt 106: remodel kitchen and bathroom. all fixtures will be in same location. | $32,000 |
| Dec 19, 2017 | Completed final sign-off Sep 2021 | 27 Talbert Ct | remodel ground floor: 1 suana, 1 1/2 bathroom. install 1 french door, seismic , holddowns per plans. relocate 1 furnace, 1 tankless water heater and 1 washer and dryer.Details
remodel ground floor: 1 suana, 1 1/2 bathroom. install 1 french door, seismic , holddowns per plans. relocate 1 furnace, 1 tankless water heater and 1 washer and dryer. | $28,000 |
| Sep 18, 2017 | Completed final sign-off Jan 2018 | 27 Talbert Ct | remodel kitchen & bath room on main level. upgrade (1) main electrical and (1) subpanel.Details
remodel kitchen & bath room on main level. upgrade (1) main electrical and (1) subpanel. | $32,000 |
| Dec 8, 2015 | Completed final sign-off Mar 2016 | 1227 Newhall St | unit a (top floor): remove & replace kitchen cabinets & 1 sink. remove & replace counter tops. remove & replace 2 bathroom sinks in bathroom #1 & master. instlal vacancy (2) sensors in bathroom (ea). all work in-kind. no walls moved, removed, altered or infilled. all layouts remain unchanged.Details
unit a (top floor): remove & replace kitchen cabinets & 1 sink. remove & replace counter tops. remove & replace 2 bathroom sinks in bathroom #1 & master. instlal vacancy (2) sensors in bathroom (ea). all work in-kind. no walls moved, removed, altered or infilled. all layouts remain unchanged. | $9,700 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 1227 Newhall St | apt b - to comply with nov 201570621 - replace kitchen countertop & backsplash (#11), clean & repair bathroom (#13), 1 sink 'p' trap install (#8), remove 1 non-permitted wall (#3). other items on nov outstanding.Details
apt b - to comply with nov 201570621 - replace kitchen countertop & backsplash (#11), clean & repair bathroom (#13), 1 sink 'p' trap install (#8), remove 1 non-permitted wall (#3). other items on nov outstanding. | $900 |
| Apr 3, 2014 | Completed final sign-off Oct 2014 | 1628 Vallejo St | unit #4: remove and replace kitchen cabinets, sink, countertop, remove and replace bathroom fixtures in location master bathroom and guest bathroom. replace 32 4" recessed can lights to led. also ex. painting of front bldg.Details
unit #4: remove and replace kitchen cabinets, sink, countertop, remove and replace bathroom fixtures in location master bathroom and guest bathroom. replace 32 4" recessed can lights to led. also ex. painting of front bldg. | $35,000 |
| Jan 6, 2014 | Completed final sign-off Jul 2014 | 40 Melra Ct | 1)1st floor:add 2 bedrooms, one hall and one bathroom. 2)2nd floor: replace 1-92"x 56" and 1-55"x 56" windows. (vif) every bedrooms with smock detector.Details
1)1st floor:add 2 bedrooms, one hall and one bathroom. 2)2nd floor: replace 1-92"x 56" and 1-55"x 56" windows. (vif) every bedrooms with smock detector. | $42,000 |
| Aug 31, 2012 | Completed final sign-off Aug 2013 | 29 Ford St | remodel (e) kitchen & laundry room. remodel (e) bathroom. create (n) bathroom from (e) closet.Details
remodel (e) kitchen & laundry room. remodel (e) bathroom. create (n) bathroom from (e) closet. | $35,000 |
| Jan 16, 2009 | Completed final sign-off Apr 2009 | 1245 Anza St | work on #1247 anza st only.remodel kitchen and 1 bath with fixting opening. new tile, counters, appliances, fixtures. lighting will comply w/title 24.Details
work on #1247 anza st only.remodel kitchen and 1 bath with fixting opening. new tile, counters, appliances, fixtures. lighting will comply w/title 24. | $30,000 |