Bay Cities Fire Protection
- Based in
- Santa Rosa
- On San Francisco permits
- Feb 2008 to Jun 2024
- Last 24 months
- 0 permits filed
72 permits since 2000: 51 completed, 1 in progress, 17 never finaled, 3 expired or cancelled.
Of the 17 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 31 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2015 | Completed final sign-off May 2015 | 158 11th St | 1) add one sprinkler in women and in men extended restrooms. 2)after modification of stair reinstall back 2 heads and add 1. n/a for the maherDetails
1) add one sprinkler in women and in men extended restrooms. 2)after modification of stair reinstall back 2 heads and add 1. n/a for the maher | $800 |
| Apr 10, 2014 | Completed final sign-off Sep 2014 | 2250 Hayes St | install sprinklers on floors 2,3,4 existing system. includes tenant work at suite 405. connect at 4" standpipe in east stair. total sprinklers on 2nd floor 158 and 3rd floor 121. 4th floor 135.n/a for the maher ordinance #155-13.Details
install sprinklers on floors 2,3,4 existing system. includes tenant work at suite 405. connect at 4" standpipe in east stair. total sprinklers on 2nd floor 158 and 3rd floor 121. 4th floor 135.n/a for the maher ordinance #155-13. | $45,000 |