Back to kitchen remodel contractors
Bay Cities Construction** Check I.D.****
- Based in
- Daly City
- On San Francisco permits
- Feb 2012 to Apr 2025
- Last 24 months
- 1 permit filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 13 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2025 | Completed final sign-off Jun 2026 | 39 Seal Rock Dr | 1st/f: resize e) playroom & powder rm, new wet bar in playroom, add bedroom w/ full bath. relocate laundry & utilities. 2nd/f: remodel e) bedrooms & bathroom, reconfigure kitchen, family & dining rm, add 1 full bath. new decks at rear, add skylights, infill lightwellDetails
1st/f: resize e) playroom & powder rm, new wet bar in playroom, add bedroom w/ full bath. relocate laundry & utilities. 2nd/f: remodel e) bedrooms & bathroom, reconfigure kitchen, family & dining rm, add 1 full bath. new decks at rear, add skylights, infill lightwell | $260,000 |
| May 8, 2024 | Completed final sign-off May 2026 | 37 Sadowa St | 2/f: relocate (e) kitchen and remodel (e) bath. add (1) new bath and infill (e) lightwell.Details
2/f: relocate (e) kitchen and remodel (e) bath. add (1) new bath and infill (e) lightwell. | $55,000 |
| Jan 15, 2019 | Completed final sign-off Sep 2019 | 1284 27th Av | 1st fl - add 2 bedroom, family room, 2 full baths; 2nd fl - add 2 bedrooms, 2 full baths, remodel (e) kitchen and bathroom, replace portion of exterior wall shingle with stucco. replace south side windows. relocate entry door.Details
1st fl - add 2 bedroom, family room, 2 full baths; 2nd fl - add 2 bedrooms, 2 full baths, remodel (e) kitchen and bathroom, replace portion of exterior wall shingle with stucco. replace south side windows. relocate entry door. | $100,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 968 Huron Av | 1st fl: remove kitchen sink & counter. convert part of family rm to a media room. to comply wiht case # 2018-008790 enf. discontinue child care use.Details
1st fl: remove kitchen sink & counter. convert part of family rm to a media room. to comply wiht case # 2018-008790 enf. discontinue child care use. | $3,000 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 507 Dellbrook Av | renovation of (e) kitchen and bathroom @ main floor upstairsDetails
renovation of (e) kitchen and bathroom @ main floor upstairs | $35,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2021 | 1840 24th Av | to legalize ground unit per ordinance 43-14 to add kitchen and living area in (e) ground flr.Details
to legalize ground unit per ordinance 43-14 to add kitchen and living area in (e) ground flr. | $30,000 |
| Oct 13, 2015 | Completed final sign-off May 2016 | 1722 45th Av | remove/demo unpermitted kitchen counter top, cab, and plmbing and electrical fixtures.Details
remove/demo unpermitted kitchen counter top, cab, and plmbing and electrical fixtures. | $500 |
| Mar 20, 2014 | Completed final sign-off Dec 2014 | 384 San Benito Wy | in 1st floor: add a family room, a guest room, a bedrroom, a exercise room, remodel (e) bath, add 2 baths. repair slab and footing. 2nd floor: remodel (e) bath, kitchen, add 2 baths. sprinkler required @ 1st floor.Details
in 1st floor: add a family room, a guest room, a bedrroom, a exercise room, remodel (e) bath, add 2 baths. repair slab and footing. 2nd floor: remodel (e) bath, kitchen, add 2 baths. sprinkler required @ 1st floor. | $240,000 |
| Feb 17, 2012 | Completed final sign-off Jul 2012 | 2332 Anza St | interior renovation/(garage)1st fl-add a guest room, playroom & a bathroom. 2nd fl-remodel kitchen, power room & laundry room. 3rd fl-remodel bathroom & add a bathroomDetails
interior renovation/(garage)1st fl-add a guest room, playroom & a bathroom. 2nd fl-remodel kitchen, power room & laundry room. 3rd fl-remodel bathroom & add a bathroom | $48,000 |