Back to kitchen remodel contractors
Bay Buzz Saw Construction
- Based in
- San Jose
- On San Francisco permits
- Jun 2011 to Oct 2011
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2011 | Completed final sign-off Oct 2011 | 1000 Franklin St | unit #5: replace (e) countertop with granite top, plumbing sink and faucet hook up and add new outlets on existing line, repl 4 electrical outlets (existing) in kitchenDetails
unit #5: replace (e) countertop with granite top, plumbing sink and faucet hook up and add new outlets on existing line, repl 4 electrical outlets (existing) in kitchen | $5,400 |
| Aug 22, 2011 | Expired or cancelled expired Jan 2013 | 179 Ralston St | refacing cabinet, new countertop, new sink, add 3 new outlets to existing line and 2 circuits upgrade, kitchen remodel, 50% of lighting shall be high efficacy.Details
refacing cabinet, new countertop, new sink, add 3 new outlets to existing line and 2 circuits upgrade, kitchen remodel, 50% of lighting shall be high efficacy. | $13,000 |
| Aug 19, 2011 | Completed final sign-off Sep 2011 | 2579 41st Av | (n) countertop, (n) sink & 4-(n) outlets to (e) line for kitchen remodel.Details
(n) countertop, (n) sink & 4-(n) outlets to (e) line for kitchen remodel. | $10,000 |
| Jul 21, 2011 | Completed final sign-off Aug 2011 | 267 Niagara Av | remodel kitchen, drop waste line, sink and faucet hook up, add new outlet to existing line, replace outlets, (e) duplex gfi, upgrade 2 circuits.Details
remodel kitchen, drop waste line, sink and faucet hook up, add new outlet to existing line, replace outlets, (e) duplex gfi, upgrade 2 circuits. | $14,600 |
| Jun 7, 2011 | Completed final sign-off Jul 2011 | 1873 Bush St | one kitchen remodel (change cabinets, countertop, plumbing & electrical) and counter topDetails
one kitchen remodel (change cabinets, countertop, plumbing & electrical) and counter top | $3,000 |