Back to bathroom remodel contractors
Bay Built
- Based in
- Pacifica
- On San Francisco permits
- Jan 2010 to Apr 2019
- Last 24 months
- 0 permits filed
37 permits since 2000: 21 completed, 6 never finaled, 10 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 343 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2018 | Expired or cancelled revoked Nov 2019 | 292 Eureka St | to comply with nov#201877311 - interior remodel. remodel (e) 4 bathrooms and (e) 1 kitchen. new floors, cabinetry and tile. no plan required per nov.Details
to comply with nov#201877311 - interior remodel. remodel (e) 4 bathrooms and (e) 1 kitchen. new floors, cabinetry and tile. no plan required per nov. | $160,000 |
| Jul 3, 2018 | Expired or cancelled revoked Nov 2019 | 292 Eureka St | replace all exterior windows size to size in kind. replace door to window on ground floor. remodel kitchen and bath & wet barDetails
replace all exterior windows size to size in kind. replace door to window on ground floor. remodel kitchen and bath & wet bar | $34,000 |
| Dec 1, 2015 | Completed final sign-off Nov 2016 | 301 Mission St | 24e-remodel kitchen, replace stove,replace backsplash tiles. remodel master bath, replace (e) tub with (n) shower, replce tile & vanity. remove wall seperating (e) 2nd bedroom & living area, replace with collapsible partition. retrofit (6) halagen/fluorescent lighting with (n)led lighting. n/a maherDetails
24e-remodel kitchen, replace stove,replace backsplash tiles. remodel master bath, replace (e) tub with (n) shower, replce tile & vanity. remove wall seperating (e) 2nd bedroom & living area, replace with collapsible partition. retrofit (6) halagen/fluorescent lighting with (n)led lighting. n/a maher | $20,000 |
| Jul 13, 2015 | Completed final sign-off Jun 2017 | 15 Peters Av | remodel existing storage/utility area, add (n) bathroom & kitchen to creat additional habitable unit. demo & replace (e) retaining wall at rear of property. add (n) skylight to kitchen @ middle floor.Details
remodel existing storage/utility area, add (n) bathroom & kitchen to creat additional habitable unit. demo & replace (e) retaining wall at rear of property. add (n) skylight to kitchen @ middle floor. | $25,000 |
| May 12, 2015 | Completed final sign-off Jul 2017 | 15 Peters Av | replace windows, size to size. remodel bathroom, powder room & kitchen (replace all appliances). reinforce/replace framing as needed, repair entry stair less than 50%. install new tile at front entry. replace interior paneling and hardware throughout as needed.Details
replace windows, size to size. remodel bathroom, powder room & kitchen (replace all appliances). reinforce/replace framing as needed, repair entry stair less than 50%. install new tile at front entry. replace interior paneling and hardware throughout as needed. | $48,000 |
| Apr 22, 2015 | Expired or cancelled expired Jul 2017 | 1915 Stockton St | remodel (e) bathrooms (5) and (e) kitchens (2). replace windows size for size, same location - rear and side windows only. work on all floorsDetails
remodel (e) bathrooms (5) and (e) kitchens (2). replace windows size for size, same location - rear and side windows only. work on all floors | $45,000 |
| Oct 31, 2014 | Completed final sign-off Oct 2015 | 1321 South Van Ness Av | add skylight. replace doors, windows and siding at rear walls. replace railing on existing rear deck, kitche, bath renovation. powder room relocation. addition of washer/dryer at upper fl. reconfigure e closets throughout. replace front windows size to size in kind. replace rear balcony; maher n/aDetails
add skylight. replace doors, windows and siding at rear walls. replace railing on existing rear deck, kitche, bath renovation. powder room relocation. addition of washer/dryer at upper fl. reconfigure e closets throughout. replace front windows size to size in kind. replace rear balcony; maher n/a | $50,000 |
| Sep 23, 2014 | Never finaled issued Sep 2014, no final | 1738 26th Av | revision to pa#201408042866 revise master bath & kitchen layout.Details
revision to pa#201408042866 revise master bath & kitchen layout. | |
| Aug 4, 2014 | Completed final sign-off Feb 2016 | 1738 26th Av | interior remodel:remodel all extg bathrooms and kitchen. add framing per plans. add washer dryer hookup in 1st floor closet. legalize and remodel ground floor bathroom. increase habitable area by adding 2 bedroom to ground floor. replace exterior windows size to size double glazed similar style toDetails
interior remodel:remodel all extg bathrooms and kitchen. add framing per plans. add washer dryer hookup in 1st floor closet. legalize and remodel ground floor bathroom. increase habitable area by adding 2 bedroom to ground floor. replace exterior windows size to size double glazed similar style to | $40,000 |
| May 15, 2014 | Completed final sign-off Oct 2014 | 430 Gates St | construct four dormers on the attic top floor. add the bathroom on the top floor. all new windows should be wood frame to match the extg. (addition of 120 useable floor area per bernal sud. mass reduction at eaves.)Details
construct four dormers on the attic top floor. add the bathroom on the top floor. all new windows should be wood frame to match the extg. (addition of 120 useable floor area per bernal sud. mass reduction at eaves.) | $38,000 |
| Oct 29, 2013 | Completed final sign-off Jun 2014 | 1355 Page St | replace brick foundation on ground floor. add foundaton as specified on the plans. legalize ground fl, 3 bedrooms, family room and 2 full baths. repair existing deck and stairs under 50%. replace (cenohen) windows. replace windows size to size same style.Details
replace brick foundation on ground floor. add foundaton as specified on the plans. legalize ground fl, 3 bedrooms, family room and 2 full baths. repair existing deck and stairs under 50%. replace (cenohen) windows. replace windows size to size same style. | $35,000 |
| Oct 11, 2013 | Completed final sign-off Jan 2015 | 4070 23rd St | remodel 2 bathrooms and kitchen (same locations) - replace all elec. wirings and or legalize existing. replace all plumbing in the bldg.Details
remodel 2 bathrooms and kitchen (same locations) - replace all elec. wirings and or legalize existing. replace all plumbing in the bldg. | $40,000 |
| May 22, 2013 | Completed final sign-off Jun 2014 | 1355 Page St | upgrade plumbing and electrical. remodel (e) bathrooms and kitchen (same location). install scaffolding and paint in/out.Details
upgrade plumbing and electrical. remodel (e) bathrooms and kitchen (same location). install scaffolding and paint in/out. | $35,000 |
| May 13, 2013 | Completed final sign-off Jan 2014 | 189 College Av | #1 & #2- remove all existing tiles, kitchen cabinetry, bathrooms cabinetry and fixtures. install new cabinets & fixtures in same location. 2 kitchen & 3 bathrooms renovation. no structural work to be performed.Details
#1 & #2- remove all existing tiles, kitchen cabinetry, bathrooms cabinetry and fixtures. install new cabinets & fixtures in same location. 2 kitchen & 3 bathrooms renovation. no structural work to be performed. | $1,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 2424 Vicente St | legalize 2 bedrooms, 1 bathroom on ground floor. expand bathoom 3' on 1 side, the same floor, ground floor.Details
legalize 2 bedrooms, 1 bathroom on ground floor. expand bathoom 3' on 1 side, the same floor, ground floor. | $35,000 |
| Nov 26, 2012 | Completed final sign-off Feb 2013 | 2039 Pine St | replace one kitchen cabinet (same location(, remove existing plmbg & elec & install new modern wiring & plmbg. install 8 recessed lights fixtures on the kitchen wiring, remodel 2 side by side existing bathrooms, install all new lights shall be "led", new ceiling fans & wiring plmbg ;install jbox & 9Details
replace one kitchen cabinet (same location(, remove existing plmbg & elec & install new modern wiring & plmbg. install 8 recessed lights fixtures on the kitchen wiring, remodel 2 side by side existing bathrooms, install all new lights shall be "led", new ceiling fans & wiring plmbg ;install jbox & 9 | $8,000 |
| Dec 20, 2010 | Completed final sign-off Oct 2011 | 149 Anderson St | add four dormers on the top level ( attic) and new full bathroom. build new stair case leading to the (e) atticDetails
add four dormers on the top level ( attic) and new full bathroom. build new stair case leading to the (e) attic | $25,000 |