Bay Area Activo Inc.
- Based in
- San Jose
- On San Francisco permits
- Aug 2018 to Jul 2026
- Last 24 months
- 7 permits filed
31 permits since 2000: 20 completed, 2 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 2 never finaled. Typically 0 days from filing to permit and 45 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2024 | Completed final sign-off Aug 2024 | 85 Osceola Ln | addressing nov# 201894012 item #2: repairing the metal stair stringer (at rear).Details
addressing nov# 201894012 item #2: repairing the metal stair stringer (at rear). | $2,000 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 1150 Scott St | replacement of deteriorating matel brackets supporting concrete treads and risers at exterior stairs. (74) stair repair < 50%Details
replacement of deteriorating matel brackets supporting concrete treads and risers at exterior stairs. (74) stair repair < 50% | $100,000 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 1150 Scott St | structural repairs on an (e) apartment housing; note: termite damage, repair work on 12 locations. item no's: 3a, 3b, 3c, 3f, 3g, 3h, 3i, 3j as listed in western exterminator company report dated 5/11/2018. egress to be maintained. building #1(1), 4(3), 5(2), 6(3), 7(2), 9(1) (12 stairways)Details
structural repairs on an (e) apartment housing; note: termite damage, repair work on 12 locations. item no's: 3a, 3b, 3c, 3f, 3g, 3h, 3i, 3j as listed in western exterminator company report dated 5/11/2018. egress to be maintained. building #1(1), 4(3), 5(2), 6(3), 7(2), 9(1) (12 stairways) | $65,000 |