Back to bathroom remodel contractors
Bassad Inc./Dba: Everlast Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jan 2014 to Jun 2022
- Last 24 months
- 0 permits filed
111 permits since 2000: 85 completed, 21 never finaled, 5 expired or cancelled.
Of the 21 never-finaled permits, 14 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
69 bathroom remodel permits: 53 completed, 13 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2022 | Completed final sign-off Jan 2025 | 341 Crestmont Dr | remodel at 341-343 crestmont: lower level(343): new sheetrock throughout. remove and replace some int. walls. install insul. at ext walls. replace all elec. mech. remodel kitchen. remodel 2 bathrooms and add one bathroomDetails
remodel at 341-343 crestmont: lower level(343): new sheetrock throughout. remove and replace some int. walls. install insul. at ext walls. replace all elec. mech. remodel kitchen. remodel 2 bathrooms and add one bathroom | $28,000 |
| Sep 24, 2021 | Completed final sign-off Jun 2022 | 1095 Pacheco St | bathroom remodeling like to like. upgrade plumbing and electricalDetails
bathroom remodeling like to like. upgrade plumbing and electrical | $7,500 |
| Aug 24, 2021 | Completed final sign-off Nov 2021 | 70 Sanchez St | 1/f: convert closet to bathroom: install toilet, vanity shower pan, exhaust fan, & 2 recessed lightsDetails
1/f: convert closet to bathroom: install toilet, vanity shower pan, exhaust fan, & 2 recessed lights | $8,000 |
| Jul 29, 2021 | Never finaled issued Jul 2021, no final | 772 Noe St | bath remodel like to like: 2 bathrooms: non structuralDetails
bath remodel like to like: 2 bathrooms: non structural | $7,000 |
| Jul 29, 2021 | Completed final sign-off Jan 2022 | 3344 21st St | 1 & 1/2 bath remodel. convert tub to walk in shower, add toiletDetails
1 & 1/2 bath remodel. convert tub to walk in shower, add toilet | $9,500 |
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 552 Roosevelt Wy | one bathroom remodeling like for like, convert tub to steam shower. no structural.Details
one bathroom remodeling like for like, convert tub to steam shower. no structural. | $15,000 |
| Jun 7, 2021 | Completed final sign-off Feb 2022 | 2708 Pine St | adding a bathroom at the living room. install toilet, walk-in shower and vanity. add recessed lights. replacing a tub at the (e) bathroom.Details
adding a bathroom at the living room. install toilet, walk-in shower and vanity. add recessed lights. replacing a tub at the (e) bathroom. | $17,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2021 | 73 Sumner St | one bathroom and one kitchen remodeling - like for like. non structuralDetails
one bathroom and one kitchen remodeling - like for like. non structural | $19,000 |
| May 18, 2021 | Completed final sign-off Mar 2022 | 198 Bradford St | one bathroom remodel like to like. non-structural. no change of layout.Details
one bathroom remodel like to like. non-structural. no change of layout. | $7,000 |
| May 18, 2021 | Never finaled issued May 2021, no final | 555 Junipero Serra Bl | bathroom remodel like to like. no change to layout or wall/opening.Details
bathroom remodel like to like. no change to layout or wall/opening. | $7,000 |
| Apr 22, 2021 | Completed final sign-off Jun 2021 | 799 La Playa | remodel bathroom: like for like, in-kind.Details
remodel bathroom: like for like, in-kind. | $7,000 |
| Apr 9, 2021 | Completed final sign-off Jul 2021 | 167 07th Av | 2 bathrooms remodel in-kind. no new wall no exisitng wall relocation. fixtures to be remain the same location. new lighting comply w/ cec 150.1 (k) 5Details
2 bathrooms remodel in-kind. no new wall no exisitng wall relocation. fixtures to be remain the same location. new lighting comply w/ cec 150.1 (k) 5 | $14,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 28 El Sereno Ct | revision to bpa#202102114458, reduction of scope of work, (1) bathroom remodel like-to-likeDetails
revision to bpa#202102114458, reduction of scope of work, (1) bathroom remodel like-to-like | |
| Feb 11, 2021 | Completed final sign-off Aug 2021 | 28 El Sereno Ct | kitchen remodeling like to like. 2 bathrooms remodeling like to like. rewire and upgrade electric panel to 200 amp.Details
kitchen remodeling like to like. 2 bathrooms remodeling like to like. rewire and upgrade electric panel to 200 amp. | $42,000 |
| Feb 11, 2021 | Never finaled issued Feb 2021, no final | 254 Dublin St | bathroom remodeling like to like. add 3 recessed lights.Details
bathroom remodeling like to like. add 3 recessed lights. | $8,000 |
| Jan 13, 2021 | Never finaled issued Jan 2021, no final | 241 Downey St | bathroom remodel, like for like.Details
bathroom remodel, like for like. | $8,000 |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 4279 22nd St | bathroom remodel - convert tub to a walk in showerDetails
bathroom remodel - convert tub to a walk in shower | $8,000 |
| Dec 3, 2020 | Completed final sign-off Mar 2021 | 239 23rd Av | bathroom remodeling. convert tub to a walk showerDetails
bathroom remodeling. convert tub to a walk shower | $8,000 |
| Dec 2, 2020 | Completed final sign-off Feb 2021 | 1433 Balboa St | bathroom remodeling convert tub into a walk-in shower.Details
bathroom remodeling convert tub into a walk-in shower. | $8,000 |
| Dec 2, 2020 | Completed final sign-off Jan 2021 | 606 Kansas St | bathroom remodeling: convert tub to a walk-in shower.Details
bathroom remodeling: convert tub to a walk-in shower. | $8,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 2359 Jackson St | bathroom and kitchen remodeling. like to like. add 4 recessed lights at the bathroom. tankless water heater. relocate the washer and dryer. rewireDetails
bathroom and kitchen remodeling. like to like. add 4 recessed lights at the bathroom. tankless water heater. relocate the washer and dryer. rewire | $42,500 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 4038 Folsom St | bathroom remodeling like for like. adding 4 recessed lightsDetails
bathroom remodeling like for like. adding 4 recessed lights | $10,500 |
| Sep 9, 2020 | Completed final sign-off Feb 2021 | 1059 Oak St | kitchen & bath remodeling like for like, no structural work.Details
kitchen & bath remodeling like for like, no structural work. | $38,000 |
| Sep 1, 2020 | Completed final sign-off Jan 2021 | 6446 Geary Bl | bathroom remodeling/unit 3.Details
bathroom remodeling/unit 3. | $12,000 |
| Sep 1, 2020 | Completed final sign-off Mar 2022 | 198 Bradford St | complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement.Details
complete remodeling - bathroom convert tub to walk in shower. upgrade plumbing, kitchen, remodeling - upgrade plumbing and electrical. hvac- install furnace, and condenses. upgrade panel box, rewire electrical, roof replacement. | $101,720 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 412 College Av | bathroom remodeling in-kind on 2/f. rewiring electrical up to code. no wall removal or modifications. layout remains unchanged.Details
bathroom remodeling in-kind on 2/f. rewiring electrical up to code. no wall removal or modifications. layout remains unchanged. | $34,000 |
| Jul 5, 2019 | Completed final sign-off Jun 2021 | 146 Saint Charles Av | to comply w/ #201866361 (1) (n) adu per ord #95-17. remodel basement to become liveable area. install bathroom, bedroom, & office w/ all electrical & plumbing neccessary. install window for bedroom escape.Details
to comply w/ #201866361 (1) (n) adu per ord #95-17. remodel basement to become liveable area. install bathroom, bedroom, & office w/ all electrical & plumbing neccessary. install window for bedroom escape. | $60,000 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 180 07th St | (2) bathroom remodel like for like (no change of existing floor plan)Details
(2) bathroom remodel like for like (no change of existing floor plan) | $8,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 369 18th Av | bathroom remodeling - changing tub to showerDetails
bathroom remodeling - changing tub to shower | $5,000 |
| May 24, 2019 | Completed final sign-off Dec 2019 | 2415 Van Ness Av | bathroom remodel - changing tub to shower rewiring electrical up to code, replacing kitchen counter top, adding lights. no wall removal.Details
bathroom remodel - changing tub to shower rewiring electrical up to code, replacing kitchen counter top, adding lights. no wall removal. | $30,000 |
| Apr 10, 2019 | Completed final sign-off Nov 2019 | 278 Ralston St | kitchen and bathroom rmeodel like for like. rewire entire house.Details
kitchen and bathroom rmeodel like for like. rewire entire house. | $25,000 |
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 855 Folsom St | kitchen & half-bath remodel, like for like. replacing countertop backsplash at kitchen, electrc-plumb for half-bath and master bath.Details
kitchen & half-bath remodel, like for like. replacing countertop backsplash at kitchen, electrc-plumb for half-bath and master bath. | $15,000 |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 443 Andover St | bathroom remodel like for like.Details
bathroom remodel like for like. | $5,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 400 Clayton St | remodel master bath, hallway bath & watercloset room.Details
remodel master bath, hallway bath & watercloset room. | $35,000 |
| Oct 16, 2018 | Completed final sign-off Jul 2019 | 81 Lansing St | bathroom remodeling- like for like. replacing tub with motor tub install all new features, 4-6 recessed lights, new dry wall, move the wall near the tub a few inches add new wall for niches.Details
bathroom remodeling- like for like. replacing tub with motor tub install all new features, 4-6 recessed lights, new dry wall, move the wall near the tub a few inches add new wall for niches. | $10,000 |
| Feb 20, 2018 | Expired or cancelled expired Jan 2020 | 403 Broderick St | to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry.Details
to remove two walls between kitchen and living room & to remove 6" soffit over the kitchen, kitchen and bathroom remodel and replace old with new skylight. add laundry. | $20,000 |
| Jan 25, 2018 | Completed final sign-off Oct 2018 | 273 Lexington St | revision to 201710040406: convert 2 closets into a 3/4 bathroom with shower, toilet, sink.Details
revision to 201710040406: convert 2 closets into a 3/4 bathroom with shower, toilet, sink. | $14,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 260 King St | 2 bathroom remodels like for likeDetails
2 bathroom remodels like for like | $12,000 |
| Nov 7, 2017 | Completed final sign-off Jul 2018 | 221 Page St | bathroom remodel - replace tile on walls and floor, re-load shower head plumbing , replace vanity, install new switches in bathroom, install new light fixture, paint mater bathroom, upper unit.Details
bathroom remodel - replace tile on walls and floor, re-load shower head plumbing , replace vanity, install new switches in bathroom, install new light fixture, paint mater bathroom, upper unit. | $5,000 |
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 2444 Chestnut St | bathroom remodel like for like - replace vanity, replace 2 toilets, exhaust fan, light fixtures, shower; kitchen remodel like for like - replace cabinet doors & countertopDetails
bathroom remodel like for like - replace vanity, replace 2 toilets, exhaust fan, light fixtures, shower; kitchen remodel like for like - replace cabinet doors & countertop | $7,000 |
| Oct 4, 2017 | Completed final sign-off Oct 2018 | 273 Lexington St | apt b: bathroom 1:remodel, like for like -replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace tub. bathroom 2: remodel like for like - replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace shower.Details
apt b: bathroom 1:remodel, like for like -replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace tub. bathroom 2: remodel like for like - replace vanity, replace toilet, replace exhaust fan, replace light fixtures, replace shower. | $14,000 |
| Sep 13, 2017 | Expired or cancelled cancelled Nov 2017 | 825 25th Av | full bathroom remodel, everything stays in same location just being upgraded, new tub, new tile on walls & floors, new vanity, light fixts. no structural work.Details
full bathroom remodel, everything stays in same location just being upgraded, new tub, new tile on walls & floors, new vanity, light fixts. no structural work. | $13,900 |
| Aug 10, 2017 | Completed final sign-off Nov 2017 | 524 10th Av | 2nd fl: bathroom remodel/update fixtures & electrical. change fixtures. remove non-bearing wall in bathroom.Details
2nd fl: bathroom remodel/update fixtures & electrical. change fixtures. remove non-bearing wall in bathroom. | $25,000 |
| May 18, 2017 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | revision to 201611293698 legalize (e) laundry room to tv room. relocate in w/d to garage. ele outlet for exhaust fan. revision to 201701247783 - new flooring, casework, vanity, countertop, 3 sink for baths & tubs, 1 shower, remodel 2 baths, remove load bearing wall. remodelDetails
revision to 201611293698 legalize (e) laundry room to tv room. relocate in w/d to garage. ele outlet for exhaust fan. revision to 201701247783 - new flooring, casework, vanity, countertop, 3 sink for baths & tubs, 1 shower, remodel 2 baths, remove load bearing wall. remodel | $70,000 |
| Jan 24, 2017 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | 2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layoutDetails
2nd fl remodel bathroom, new flooring, casework, countertop and sink on kitchen. remove load bearing wall and new beam 1st fl remodel new stairway layout | $30,000 |
| Dec 12, 2016 | Never finaled issued Dec 2016, no final | 4495 17th St | ref 201508073684. install new construction windows (vinyl) at new addition as shown in plans, replace 2 windows 2/f bathroom). u-factor 0.32 max.Details
ref 201508073684. install new construction windows (vinyl) at new addition as shown in plans, replace 2 windows 2/f bathroom). u-factor 0.32 max. | $2,400 |
| Nov 29, 2016 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | remodel interior stairway, living room, kitchen and bath. legalize laundry rm to entertainment roomDetails
remodel interior stairway, living room, kitchen and bath. legalize laundry rm to entertainment room | $40,000 |
| Nov 29, 2016 | Completed final sign-off Aug 2017 | 1411 Newcomb Av | new bathroom floor tile, new tile walls,n ew tub instaltion, one recessed light above the tub, new lighting above the sink. install new fan. no change on walls.Details
new bathroom floor tile, new tile walls,n ew tub instaltion, one recessed light above the tub, new lighting above the sink. install new fan. no change on walls. | $4,000 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 1119 Cayuga Av | remove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement.Details
remove interior load bearing wall. propose (n) psl beam & post. remodel kitchen and (n) casework. replace appliance and plumbing fixture, retile floor and update electrical fixtures legalize (e) bath in basement. | $30,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 758 Haight St | apt 4: hall bathroom remodel: remove (e) tile and fixtures. replace vanity, install new lights, new paint.Details
apt 4: hall bathroom remodel: remove (e) tile and fixtures. replace vanity, install new lights, new paint. | $14,000 |
| Jul 12, 2016 | Completed final sign-off Aug 2016 | 3731 Fillmore St | hall bathroom remodel - remove (e) corner shower, convert (e) tub to shower, relocate sink & vanity. new lights & gfci, new wall cabinet. replace existing window (same size and location). does not face street.Details
hall bathroom remodel - remove (e) corner shower, convert (e) tub to shower, relocate sink & vanity. new lights & gfci, new wall cabinet. replace existing window (same size and location). does not face street. | $15,000 |
| May 6, 2016 | Completed final sign-off Jul 2016 | 2727 42nd Av | 2nd story hall bathroom remodel. tub becomes shower. replace toilet, sink. upgrade all electrical, ass 1 outlet, 1 ledDetails
2nd story hall bathroom remodel. tub becomes shower. replace toilet, sink. upgrade all electrical, ass 1 outlet, 1 led | $17,000 |
| Apr 11, 2016 | Completed final sign-off Jan 2017 | 218 Holloway Av | 1)construct interior non bearing and nonstructural walls. 2)full kitchen, 3) bathroom, and 4) bedroom, ground floor unit legalizationDetails
1)construct interior non bearing and nonstructural walls. 2)full kitchen, 3) bathroom, and 4) bedroom, ground floor unit legalization | $25,000 |
| Apr 6, 2016 | Completed final sign-off Jan 2017 | 310 Townsend St | bathroom remodel: replace all fixtures like to like. upgrade electrical and plumbing, add (6) recessed leds to bathroom and (4) to adjacent bedroom. install exhaust fan, tile floor and wall, tub becomes shower. note: provide humidistatDetails
bathroom remodel: replace all fixtures like to like. upgrade electrical and plumbing, add (6) recessed leds to bathroom and (4) to adjacent bedroom. install exhaust fan, tile floor and wall, tub becomes shower. note: provide humidistat | $6,000 |
| Apr 6, 2016 | Completed final sign-off May 2016 | 127 Knollview Wy | install (2) exhaust fans to bathroom, one in shower and one in bathroom general area. provide humidistat like for like. bathroom remodel; upgrade all plumbing and electrical, shower pan, replace fixtures.Details
install (2) exhaust fans to bathroom, one in shower and one in bathroom general area. provide humidistat like for like. bathroom remodel; upgrade all plumbing and electrical, shower pan, replace fixtures. | $10,000 |
| Mar 9, 2016 | Completed final sign-off Jul 2016 | 756 Thornton Av | 2nd fl bathroom remodel. replace shower wall tile. replace fixts like for like. new exhaust fan. no structural work. same configuration. n/a for maher.Details
2nd fl bathroom remodel. replace shower wall tile. replace fixts like for like. new exhaust fan. no structural work. same configuration. n/a for maher. | $10,000 |
| Feb 16, 2016 | Completed final sign-off May 2016 | 1321 Revere Av | convert bedroom to bathroom, walk in closet and office removal of non structural closet walls and construction of partition walls- installastion of all fixtures & appliances.Details
convert bedroom to bathroom, walk in closet and office removal of non structural closet walls and construction of partition walls- installastion of all fixtures & appliances. | $20,000 |
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 1317 Judah St | replace skylights same size & location. add 20 recessed lights throughout unit, add solor tube to laundry room, remodel kitchen and master bath like for like. maher not reqDetails
replace skylights same size & location. add 20 recessed lights throughout unit, add solor tube to laundry room, remodel kitchen and master bath like for like. maher not req | $50,000 |
| Dec 30, 2015 | Completed final sign-off Jan 2020 | 4622 17th St | hall bath remodel 2nd fl. add a new toilet. replace tub/shower in new location. replace e fixturesDetails
hall bath remodel 2nd fl. add a new toilet. replace tub/shower in new location. replace e fixtures | $20,000 |
| Jul 7, 2015 | Completed final sign-off Mar 2016 | 1855 Sacramento St | 4th floor - unit #9: remodel master bathroom - like to like. replace toilet, shower, vanity. new tile on shower walls. no changes to windows or walls.Details
4th floor - unit #9: remodel master bathroom - like to like. replace toilet, shower, vanity. new tile on shower walls. no changes to windows or walls. | $10,000 |
| Jun 5, 2015 | Completed final sign-off Aug 2015 | 36 Dearborn St | 1/f: kitchen remodel, no change to walls or windows, replace cabinets & counters, replace sink, stove fan, dishwasher, stove, new light. 2/f: master bathroom remodel, same location, replace tub/shower, sink, new light & fan, no changes to walls or windows.Details
1/f: kitchen remodel, no change to walls or windows, replace cabinets & counters, replace sink, stove fan, dishwasher, stove, new light. 2/f: master bathroom remodel, same location, replace tub/shower, sink, new light & fan, no changes to walls or windows. | $20,000 |
| May 19, 2015 | Completed final sign-off May 2016 | 2063 32nd Av | 2nd floor bathroom remodel. replace (e) shower + tile walls. replace (e) toilet, vanity light, outlets, new fan/light (48 sq). no changes to walls or windows.Details
2nd floor bathroom remodel. replace (e) shower + tile walls. replace (e) toilet, vanity light, outlets, new fan/light (48 sq). no changes to walls or windows. | $10,000 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 311 Church St | convert 1 bathroom into 1 1/2 bathrooms - remove non load bearing wall portions. remodel kitchen like for like, remove non load bearing partitions between kitchen & dining room. convert living room into 4th bedroom - add closetDetails
convert 1 bathroom into 1 1/2 bathrooms - remove non load bearing wall portions. remodel kitchen like for like, remove non load bearing partitions between kitchen & dining room. convert living room into 4th bedroom - add closet | $45,000 |
| Mar 10, 2015 | Never finaled issued Mar 2015, no final | 664 Teresita Bl | bathroom remodel (hall bathroom) 1st floor to the closet in hall walls. remove (e) shower and replace with closet w/ entry door. replace (e0 fan, tub (to tub/shower), toilet, sink, 2 gfci. all new lighting shall be high-efficacy.Details
bathroom remodel (hall bathroom) 1st floor to the closet in hall walls. remove (e) shower and replace with closet w/ entry door. replace (e0 fan, tub (to tub/shower), toilet, sink, 2 gfci. all new lighting shall be high-efficacy. | $8,000 |
| Jan 15, 2015 | Completed final sign-off Apr 2015 | 1441 Jones St | unit 202: bathroom renovation- no change to locations of fixtures replace (e) tub, sink, vanity, toilet, tile walls around tub, exhaust fan, 2 gfci, 4 lights; maher n/a; no walls being moved.Details
unit 202: bathroom renovation- no change to locations of fixtures replace (e) tub, sink, vanity, toilet, tile walls around tub, exhaust fan, 2 gfci, 4 lights; maher n/a; no walls being moved. | $7,000 |
| Dec 31, 2014 | Completed final sign-off Mar 2015 | 821 Folsom St | renovate 2 bathrooms - no changes to windows, walls, locations of fixtures. replace (e): tub, countertops, exhaust fans, toilets, sinks, replace 8 lights in bedrooms, 1 light in each bathroom.Details
renovate 2 bathrooms - no changes to windows, walls, locations of fixtures. replace (e): tub, countertops, exhaust fans, toilets, sinks, replace 8 lights in bedrooms, 1 light in each bathroom. | $16,800 |
| Nov 12, 2014 | Completed final sign-off May 2016 | 2063 32nd Av | create bedroom, closets, bathroom & utility room at first story. reconfigure (e) stair, remove wall between kitchen and dining room. install (n) wood beams, remodel kitchen, remove partition at bedroom at rear of building. convert bedroom to living room. install (n) patio doors and replace windowsDetails
create bedroom, closets, bathroom & utility room at first story. reconfigure (e) stair, remove wall between kitchen and dining room. install (n) wood beams, remodel kitchen, remove partition at bedroom at rear of building. convert bedroom to living room. install (n) patio doors and replace windows | $70,000 |
| Jul 31, 2014 | Never finaled issued Jul 2014, no final | 308 Lily St | one bathroom remodel - electric work, plumbing - install fan, toilet, recessed cabinet , paint. non structural - upper unitDetails
one bathroom remodel - electric work, plumbing - install fan, toilet, recessed cabinet , paint. non structural - upper unit | $6,000 |
| Jul 7, 2014 | Expired or cancelled expired Oct 2016 | 6 Minerva St | bathroom remodel: install new vanity, build closet door. update plumbing and electricalDetails
bathroom remodel: install new vanity, build closet door. update plumbing and electrical | $2,500 |