Basic Modular Facilities Inc
- Based in
- San Bruno
- On San Francisco permits
- Jul 2000 to Dec 2022
- Last 24 months
- 0 permits filed
65 permits since 2000: 49 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 5 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2010 | Completed final sign-off May 2011 | 4969 17th St | interior remodel of (e) 3 level wood framed house including (n) stair from 1st level to 2nd level, widen (e) stair from 2nd level to 3rd level. infill (e) floor opening @ 3rd level with structural glass floor system, (n) lighting @ stair.Details
interior remodel of (e) 3 level wood framed house including (n) stair from 1st level to 2nd level, widen (e) stair from 2nd level to 3rd level. infill (e) floor opening @ 3rd level with structural glass floor system, (n) lighting @ stair. | $25,000 |
| Aug 2, 2010 | Completed final sign-off Sep 2010 | 2262 16th Av | replace (e) treads & risers @ front. patch stucco in spots @ ext. front. add slate to stairs. repair less than 50%, replace in kind.Details
replace (e) treads & risers @ front. patch stucco in spots @ ext. front. add slate to stairs. repair less than 50%, replace in kind. | $8,000 |
| Nov 30, 2007 | Completed final sign-off May 2008 | 60 Pearl St | revision to p/a #2005.08.17.0549. altering back bay & doors w/ related strl. details. including original "storage" into habitable space (media nook) with related strl. detail. stair alteration. all revision to ground floor only.Details
revision to p/a #2005.08.17.0549. altering back bay & doors w/ related strl. details. including original "storage" into habitable space (media nook) with related strl. detail. stair alteration. all revision to ground floor only. | $1,000 |
| Aug 17, 2005 | Completed final sign-off May 2008 | 60 Pearl St | remodel (e) storage at garage level into habitable space, with a new bathroom, new windows and doors, new interior stair to ground level.Details
remodel (e) storage at garage level into habitable space, with a new bathroom, new windows and doors, new interior stair to ground level. | $90,000 |