Back to kitchen remodel contractors
Barton Builders
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to May 2026
- Last 24 months
- 4 permits filed
23 permits since 2000: 15 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 656 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2025 | In progress issued Mar 2025 | 1033 Green St | replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290Details
replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290 | $12,000 |
| Mar 16, 2023 | Completed final sign-off Feb 2024 | 7 Upper Tr | revision to pa# 2021-1230-5207. adding structural dwgs to reinforce substandard roof & ceiling framing above kitchen.Details
revision to pa# 2021-1230-5207. adding structural dwgs to reinforce substandard roof & ceiling framing above kitchen. | $2,000 |
| Dec 30, 2021 | Completed final sign-off Jun 2024 | 7 Upper Tr | remodel (e) bathroom, change cabinets/counter @ (e) kitchenDetails
remodel (e) bathroom, change cabinets/counter @ (e) kitchen | $15,000 |
| Jan 22, 2021 | Completed final sign-off Aug 2023 | 7 Upper Tr | remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom.Details
remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom. | $60,000 |
| Feb 21, 2020 | Expired or cancelled withdrawn Jan 2021 | 7 Upper Tr | legalization & upgrades of an (e) ground fl unit in a 2-story residence. demolition of (e) wall, replacement of windows, door in rear, (n) kitchen, reconfigure bathroomDetails
legalization & upgrades of an (e) ground fl unit in a 2-story residence. demolition of (e) wall, replacement of windows, door in rear, (n) kitchen, reconfigure bathroom | $82,500 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 151 Alice B Toklas Pl | unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan.Details
unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan. | $20,000 |
| Jul 20, 2015 | Completed final sign-off Oct 2024 | 3629 Jackson St | remodel of third floor kitchen and fourth floor roof deck. enlarge windows and doors at third floor kitchen and fourth floor roof deck.Details
remodel of third floor kitchen and fourth floor roof deck. enlarge windows and doors at third floor kitchen and fourth floor roof deck. | $100,000 |
| Nov 13, 2013 | Completed final sign-off Nov 2014 | 501 Darien Wy | interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room.Details
interior remodle includes master bathroom , closet, kitchen. basement scope includes convering (e) storage space to media room, creating extra storage to be accessible & legalize (e) powder room. | $120,000 |