Barry Levitan Construction
- Based in
- Vallejo
- On San Francisco permits
- Nov 2007 to Mar 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 1 days from filing to permit and 29 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2007 | Completed final sign-off Dec 2007 | 1215 South Van Ness Av | remove existing rear stairs and landings. replace rotted framing members. replace siding at rear. install new stairs, rails. remove and replace (2) rotted wood windows. windows not visible from street.Details
remove existing rear stairs and landings. replace rotted framing members. replace siding at rear. install new stairs, rails. remove and replace (2) rotted wood windows. windows not visible from street. | $10,000 |