Back to kitchen remodel contractors
Barrett Karber Built Llc
- Based in
- Santa Monica
- On San Francisco permits
- Nov 2021 to Aug 2026
- Last 24 months
- 19 permits filed
32 permits since 2000: 18 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 4 completed, 3 in progress, 2 never finaled. Typically 3 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 2001 Pacific Av | interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layoutDetails
interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layout | $400,000 |
| Mar 11, 2026 | In progress issued Mar 2026 | 21 18th Av | rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n)Details
rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n) | $150,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 85 05th Av | remodel (e) 1 story to demolish and replace in kind the kitchen counter appliance kitchen window, stucco wall finish at kitchen and primary bathroom . no work visible from street.Details
remodel (e) 1 story to demolish and replace in kind the kitchen counter appliance kitchen window, stucco wall finish at kitchen and primary bathroom . no work visible from street. | $250,000 |
| Sep 12, 2024 | Completed final sign-off Feb 2026 | 2850 Filbert St | kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removalDetails
kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removal | $75,000 |
| Sep 5, 2024 | Completed final sign-off Jun 2025 | 135 15th Av | interior non-structural remodel of 3 story single family residence. scope of work includes demo, electrical and plumbing permit - 1 kitchen & 3.5 barhrooms. no exterior workDetails
interior non-structural remodel of 3 story single family residence. scope of work includes demo, electrical and plumbing permit - 1 kitchen & 3.5 barhrooms. no exterior work | $150,000 |
| Dec 28, 2023 | Completed final sign-off Oct 2024 | 111 Liberty St | water leak repair. replacing 2 damaged kitchens, 1 damaged bathroom and electrical fixtures. all replacements are in like kind.Details
water leak repair. replacing 2 damaged kitchens, 1 damaged bathroom and electrical fixtures. all replacements are in like kind. | $150,000 |
| Feb 2, 2023 | Never finaled issued Mar 2023, no final | 4248 23rd St | in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen.Details
in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen. | $50,000 |
| Apr 22, 2022 | Completed final sign-off Sep 2023 | 221 Clara St | unit #3: remodel (e) kitchen in kind. nw layout for kitchen. new appliances include steam oven and built in espresso machine. run new dedicated plugs for new appliances. move gas line for new location of stove. move water lines for moving of sink.Details
unit #3: remodel (e) kitchen in kind. nw layout for kitchen. new appliances include steam oven and built in espresso machine. run new dedicated plugs for new appliances. move gas line for new location of stove. move water lines for moving of sink. | $50,000 |
| Nov 12, 2021 | Never finaled issued Nov 2022, no final | 326 Prague St | interior upgrades: revert to extg (org.) stairs, reconnection extg 1st and 2nd floor. new m. bedroom bath, new window at kitchen to replace extg, replace m. bedroom window, family room, sliding egress door, new rear yard access wd deck at + 30" above grade.Details
interior upgrades: revert to extg (org.) stairs, reconnection extg 1st and 2nd floor. new m. bedroom bath, new window at kitchen to replace extg, replace m. bedroom window, family room, sliding egress door, new rear yard access wd deck at + 30" above grade. | $20,000 |