Back to kitchen remodel contractors
Barr-951 Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Jun 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 514 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off Jul 2026 | 3781 Mission St | to comply with nov #202649619: plumupdate outlets in kitchen to gfci, update bathroom gfci and switch, cut concrete floor and patch flooring tile/update/fix grouts. dry wall patch in bathroom, paint bathroom and kitchen. all work in-kind w/(e) fixtures.Details
to comply with nov #202649619: plumupdate outlets in kitchen to gfci, update bathroom gfci and switch, cut concrete floor and patch flooring tile/update/fix grouts. dry wall patch in bathroom, paint bathroom and kitchen. all work in-kind w/(e) fixtures. | $5,500 |
| Mar 16, 2023 | Completed final sign-off Aug 2025 | 558 Athens St | replace kitchen cabinets, kitchen counter, kitchen appliances. no moving of plumbing or electrical, only replacement.Details
replace kitchen cabinets, kitchen counter, kitchen appliances. no moving of plumbing or electrical, only replacement. | $20,000 |