Baragon General Construction Inc.
- Based in
- San Leandro
- On San Francisco permits
- Mar 2018 to Jan 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 2 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 1252 Church St | staircase rerepair of less than 50%. replace smoke detectors, carbon monoxide detectors, sealing tub (replace overflow (valve), flooring repair. all to comply with nov201985243.Details
staircase rerepair of less than 50%. replace smoke detectors, carbon monoxide detectors, sealing tub (replace overflow (valve), flooring repair. all to comply with nov201985243. | $2,340 |