Bana Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Mar 2026
- Last 24 months
- 2 permits filed
83 permits since 2000: 46 completed, 29 never finaled, 8 expired or cancelled.
Of the 29 never-finaled permits, 2 are 3 to 5 years old, 11 are 5 to 10 years old, 16 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 4 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2017 | Expired or cancelled expired Jun 2021 | 310 Green St | revision to pa 2010-0930-1936 -structural drawings to show removal of stairs at rear from 3rd level to roof.Details
revision to pa 2010-0930-1936 -structural drawings to show removal of stairs at rear from 3rd level to roof. |