Back to bathroom remodel contractors
Baires Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Sep 2008 to Feb 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 38 completed, 3 in progress, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 6 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2025 | In progress issued Oct 2025 | 642 Edinburgh St | horizontal addition, 1st floor approx. 118 sq ft, new kitchen cabinets, relocate existing bathroom, relocate existing stairs(interior). renovate 2nd flr:new kitchen new bathroom,relocate stairway. construct roof deck 132.8 s.f. on horizontal additionDetails
horizontal addition, 1st floor approx. 118 sq ft, new kitchen cabinets, relocate existing bathroom, relocate existing stairs(interior). renovate 2nd flr:new kitchen new bathroom,relocate stairway. construct roof deck 132.8 s.f. on horizontal addition | $110,000 |
| Apr 10, 2023 | Completed final sign-off Oct 2024 | 354 Paris St | horizontal addition of sunroom to back of building and addition of half bath in interior home and minor renovation of the existing building.Details
horizontal addition of sunroom to back of building and addition of half bath in interior home and minor renovation of the existing building. | $85,000 |
| Apr 15, 2021 | Completed final sign-off Sep 2021 | 1412 Mcallister St | unit d - 2nd flr: addition of new laundry room inside (e) bedroom, (e) bathroom remodel, relocation of 2nd exit door, renovation of (e) kitchen casework & appliances, & installation of 2 new gas fireplace inserts into (e) gas fireplaces.Details
unit d - 2nd flr: addition of new laundry room inside (e) bedroom, (e) bathroom remodel, relocation of 2nd exit door, renovation of (e) kitchen casework & appliances, & installation of 2 new gas fireplace inserts into (e) gas fireplaces. | $55,000 |
| Jun 13, 2020 | Completed final sign-off Nov 2020 | 114 Bright St | remodeling kitchen and 2 baths in-kind, upgrading electrical panel from 50a fuse to 200a breakers.Details
remodeling kitchen and 2 baths in-kind, upgrading electrical panel from 50a fuse to 200a breakers. | $20,000 |
| Dec 16, 2016 | Completed final sign-off Feb 2017 | 118 Dolphin Ct | master bedroom remodeling: demolition and dump existing partition wall and tub, tiles, toilets. install (2) new showers. install new wall again. also change electrical panel up to code and reset lights in living room. install gfi outlets in kitchen and bathroom. n/a maherDetails
master bedroom remodeling: demolition and dump existing partition wall and tub, tiles, toilets. install (2) new showers. install new wall again. also change electrical panel up to code and reset lights in living room. install gfi outlets in kitchen and bathroom. n/a maher | $15,000 |
| Feb 10, 2015 | Never finaled issued Feb 2015, no final | 1049 Dolores St | simple bathroom remodel, new fixturs, new vanity, tiling 5 x 5Details
simple bathroom remodel, new fixturs, new vanity, tiling 5 x 5 | $12,000 |
| Oct 14, 2014 | Completed final sign-off Dec 2014 | 137 Varennes St | kitchen and bath renovation - new walls, insulation, new plumbing and gas, new electric, all new fixtures, cabinets, appliances, 3 replaced windows (no size change)flooring in kind. non load bearing walls, new led lighting.Details
kitchen and bath renovation - new walls, insulation, new plumbing and gas, new electric, all new fixtures, cabinets, appliances, 3 replaced windows (no size change)flooring in kind. non load bearing walls, new led lighting. | $55,000 |