Back to kitchen remodel contractors
Bahn Fire Protection & Plumbing Inc
- Based in
- Brisbane
- On San Francisco permits
- Jul 2005 to Nov 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 6 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2010 | Expired or cancelled expired Dec 2012 | 474 Gellert Dr | kitchen and bathroom remodel on the 2nd floor. no wall removal, no structural workDetails
kitchen and bathroom remodel on the 2nd floor. no wall removal, no structural work | $15,000 |