Babaloons Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to May 2024
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 never finaled. Typically 9 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2017 | Completed final sign-off Sep 2017 | 670 Alvarado St | replace damage decking material on top of front deck with lamineted glass remove non-compliant balustrades. 2nd floor above garage. guardrail height not less than 42" ht above finish deck.Details
replace damage decking material on top of front deck with lamineted glass remove non-compliant balustrades. 2nd floor above garage. guardrail height not less than 42" ht above finish deck. | $1,400 |
| Feb 1, 2012 | Completed final sign-off Oct 2013 | 19 Ord St | 1st floor: new bath, convert space behind garage to conditioned space for home gym. new windows at rear yard. 2nd fl: renovate kitchen/bath, replace bay window at front, new windows rear. 3rd fl: renovate bath, new windows. changes and new guardrails at existing decks at 2nd, 3rd, an roof levelsDetails
1st floor: new bath, convert space behind garage to conditioned space for home gym. new windows at rear yard. 2nd fl: renovate kitchen/bath, replace bay window at front, new windows rear. 3rd fl: renovate bath, new windows. changes and new guardrails at existing decks at 2nd, 3rd, an roof levels | $117,000 |
| Nov 7, 2011 | Completed final sign-off Mar 2012 | 358 Pacheco St | replace main breaker box(currenty fuses) install pan for w/d, repair damage wd. exterior decking, repair damage window sill, repair damage wd. in corner framing-restucco, relocate electrical line for tv, install cable/internet box for tv. install gutte cover for driveway access.Details
replace main breaker box(currenty fuses) install pan for w/d, repair damage wd. exterior decking, repair damage window sill, repair damage wd. in corner framing-restucco, relocate electrical line for tv, install cable/internet box for tv. install gutte cover for driveway access. | $7,500 |
| Jul 8, 2010 | Never finaled issued Jul 2010, no final | 118 Cresta Vista Dr | remove existing top decking on rear deck and replace with new composite decking material. no structural workDetails
remove existing top decking on rear deck and replace with new composite decking material. no structural work | $2,000 |