Babaloons Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to May 2024
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2024 | Completed final sign-off Aug 2024 | 2201 Sacramento St | unit 203: remove broken & cracked plaster in 2nd bdrm & replce with fire arated 5/8in sheetrock; install 6 fire rated recessed light cans, insulate ceiing, put ext mount switch & wiring in wall, prime & paint.Details
unit 203: remove broken & cracked plaster in 2nd bdrm & replce with fire arated 5/8in sheetrock; install 6 fire rated recessed light cans, insulate ceiing, put ext mount switch & wiring in wall, prime & paint. | $15,000 |
| May 11, 2023 | Completed final sign-off Jun 2023 | 2201 Sacramento St | unit #: 402; remove broken and cracked plaster ceiling in living room, install 5/8" fire rated sheet rock, remove and reinstall 7 recessed cans. prime and paint all work done in living room. 230 sqftDetails
unit #: 402; remove broken and cracked plaster ceiling in living room, install 5/8" fire rated sheet rock, remove and reinstall 7 recessed cans. prime and paint all work done in living room. 230 sqft | $9,000 |
| Jan 14, 2022 | Completed final sign-off Apr 2022 | 266 Nevada St | bathroom remodel in-kind. no wall altered. elec: 1 new outlet for bidet, 1 new recessed light, remove vanity box, add sconces boxes. plumbing: move tub/shower valve to more convenient location. one bath remodel on the second floor)Details
bathroom remodel in-kind. no wall altered. elec: 1 new outlet for bidet, 1 new recessed light, remove vanity box, add sconces boxes. plumbing: move tub/shower valve to more convenient location. one bath remodel on the second floor) | $28,000 |
| Feb 3, 2020 | Completed final sign-off Jul 2020 | 2901 Buchanan St | unit 1. bathroom remodel, like for like. new led recessed lights, fan, plumbing fixtures. no wall alterationsDetails
unit 1. bathroom remodel, like for like. new led recessed lights, fan, plumbing fixtures. no wall alterations | $21,000 |
| Oct 18, 2019 | Completed final sign-off Oct 2020 | 1 Daniel Burnham Ct | working in unit 1210, kitchen remodel lide for like. master and guest bathroom remodel like for like. new recessed lighting.Details
working in unit 1210, kitchen remodel lide for like. master and guest bathroom remodel like for like. new recessed lighting. | $65,000 |
| Jun 19, 2019 | Never finaled issued Jun 2019, no final | 1 Daniel Burnham Ct | unit 902: bathroom remodel (55 sq.ft.), no walls built/altered.Details
unit 902: bathroom remodel (55 sq.ft.), no walls built/altered. | $16,000 |
| Feb 12, 2019 | Completed final sign-off May 2019 | 2901 Buchanan St | apt 8: bathroom remodel new led lighting, mosture sensing fan. kitchen remodel: new gfci lines/ckts, new cabinets, countertops, appliances. no change of coniguration or wall moving. maher n/a.Details
apt 8: bathroom remodel new led lighting, mosture sensing fan. kitchen remodel: new gfci lines/ckts, new cabinets, countertops, appliances. no change of coniguration or wall moving. maher n/a. | $39,000 |
| Jul 24, 2018 | Completed final sign-off Oct 2018 | 2901 Buchanan St | light bathroom remodel: relocate shower head & new vanity. no alt to walls, window or doors.Details
light bathroom remodel: relocate shower head & new vanity. no alt to walls, window or doors. | $11,500 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 1 Daniel Burnham Ct | work in unit #219: bathroom remodel, new complaint toilet and lighting in same location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
work in unit #219: bathroom remodel, new complaint toilet and lighting in same location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $16,000 |
| Nov 2, 2017 | Completed final sign-off Apr 2018 | 2901 Buchanan St | unit 5 - remodel kitchen & bath (partial - just vanity & med cab - lighting) - upgrade electircal in unit & install recessed cons - no removing of walls.Details
unit 5 - remodel kitchen & bath (partial - just vanity & med cab - lighting) - upgrade electircal in unit & install recessed cons - no removing of walls. | $35,000 |
| Aug 4, 2017 | Completed final sign-off Dec 2017 | 250 Fell St | unit 58: light kitchen remodel, include compliant lighting & (1) bathroom remodel, no walls removed/altered. maher ord 155-13 naDetails
unit 58: light kitchen remodel, include compliant lighting & (1) bathroom remodel, no walls removed/altered. maher ord 155-13 na | $35,400 |
| Aug 3, 2017 | Completed final sign-off Sep 2017 | 670 Alvarado St | replace damage decking material on top of front deck with lamineted glass remove non-compliant balustrades. 2nd floor above garage. guardrail height not less than 42" ht above finish deck.Details
replace damage decking material on top of front deck with lamineted glass remove non-compliant balustrades. 2nd floor above garage. guardrail height not less than 42" ht above finish deck. | $1,400 |
| Jul 21, 2017 | Expired or cancelled expired Apr 2020 | 250 Fell St | #23 - kitchen remdoel, no structural changes, in like & same location, high efficancy lighting, no moving of walls, doors or windows.Details
#23 - kitchen remdoel, no structural changes, in like & same location, high efficancy lighting, no moving of walls, doors or windows. | $23,500 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 2901 Buchanan St | unit #4: kitchen remodel and partial bath remodel(tub area tiling and change valves)Details
unit #4: kitchen remodel and partial bath remodel(tub area tiling and change valves) | $15,000 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 101 Lombard St | work in unit #315w: master bath and guest bath remodel. no configuration change,no new wall and no existing wall relocation. all new bathroom fixtures to remain as in existing fixtures location. lighting shall comply with cec 150.0(k)5. all damaged sheetrock to be replaced shall be min. 5/8" type xDetails
work in unit #315w: master bath and guest bath remodel. no configuration change,no new wall and no existing wall relocation. all new bathroom fixtures to remain as in existing fixtures location. lighting shall comply with cec 150.0(k)5. all damaged sheetrock to be replaced shall be min. 5/8" type x | $23,000 |
| Mar 28, 2016 | Completed final sign-off Jul 2016 | 101 Lombard St | kitchen and bathroom remodel. no configuration change. no structural work.Details
kitchen and bathroom remodel. no configuration change. no structural work. | $36,000 |
| Oct 22, 2015 | Completed final sign-off Feb 2016 | 250 Fell St | unit #21: kitchen and bathroom remodel. no structural changes.Details
unit #21: kitchen and bathroom remodel. no structural changes. | $24,000 |
| Oct 16, 2015 | Completed final sign-off Mar 2016 | 101 Lombard St | kitchen and guest bath remodel. no structural changes.Details
kitchen and guest bath remodel. no structural changes. | $43,000 |
| Aug 5, 2015 | Completed final sign-off Mar 2016 | 2251 Broadway | apt a: kitchen & wet bar remodel - no moving of walls.Details
apt a: kitchen & wet bar remodel - no moving of walls. | $18,000 |
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 1335 Union St | unit #6 kitchen & bathroom remodel with compliant lighting. all layouts to remain unchanged. no walls moved, removed or added. n/a for maher.Details
unit #6 kitchen & bathroom remodel with compliant lighting. all layouts to remain unchanged. no walls moved, removed or added. n/a for maher. | $34,000 |
| Jun 26, 2015 | Completed final sign-off Dec 2015 | 101 Lombard St | kitchen remodel w/ compliant lighting, no moving walls. all (e) layouts to remain unchanged. no walls moved, removed or added.Details
kitchen remodel w/ compliant lighting, no moving walls. all (e) layouts to remain unchanged. no walls moved, removed or added. | $28,000 |
| Jun 26, 2015 | Completed final sign-off Mar 2016 | 101 Lombard St | master bathroom remodel w/ compliant lighting, all (e) layouts to remain unchanged. no walls moved, removed or added.Details
master bathroom remodel w/ compliant lighting, all (e) layouts to remain unchanged. no walls moved, removed or added. | $16,000 |
| Jun 26, 2015 | Completed final sign-off Feb 2016 | 101 Lombard St | bathroom remodel w/ compliant lighting, no moving walls. all layouts to remain unchanged. no walls moved, removed or added.Details
bathroom remodel w/ compliant lighting, no moving walls. all layouts to remain unchanged. no walls moved, removed or added. | $15,000 |
| Jun 3, 2015 | Completed final sign-off Jun 2015 | 101 Lombard St | to obtain final inspection for work approved under pa#2012-1018-2404. all work is complete.Details
to obtain final inspection for work approved under pa#2012-1018-2404. all work is complete. | |
| Dec 16, 2014 | Completed final sign-off Sep 2015 | 2929 Buchanan St | kitchen and bathroom remodel, no moving of wallsDetails
kitchen and bathroom remodel, no moving of walls | $33,000 |
| Dec 16, 2014 | Completed final sign-off Jun 2015 | 101 Lombard St | 1 kitchen and 2 bathrooms remodel, no moving of wallsDetails
1 kitchen and 2 bathrooms remodel, no moving of walls | $45,000 |
| Nov 13, 2014 | Completed final sign-off Jan 2015 | 514 Missouri St | bathroom remodel no walls removed.Details
bathroom remodel no walls removed. | $8,500 |
| Oct 10, 2014 | Completed final sign-off Dec 2014 | 125 De Soto St | kitchen remodel; no walls moved; to comply with cec150.0(k)3Details
kitchen remodel; no walls moved; to comply with cec150.0(k)3 | $22,000 |
| Sep 22, 2014 | Completed final sign-off Jan 2015 | 101 Lombard St | 1 kitchen remodel. no alteration of wall, window and door.Details
1 kitchen remodel. no alteration of wall, window and door. | $28,000 |
| Jul 15, 2014 | Completed final sign-off Oct 2014 | 250 Fell St | unit 63 - remodel kitchen and bath; to comply with cec150(k) 8 & 10. n/a maher ordinance # 155-13Details
unit 63 - remodel kitchen and bath; to comply with cec150(k) 8 & 10. n/a maher ordinance # 155-13 | $26,000 |
| May 16, 2014 | Completed final sign-off Aug 2014 | 540 Fell St | kitchen remodel: no structural changes, add washer/dryer, compliant lighting.Details
kitchen remodel: no structural changes, add washer/dryer, compliant lighting. | $31,000 |
| Feb 4, 2014 | Completed final sign-off May 2014 | 101 Lombard St | unit #515w bathroom remodel - no new wall and no existing wall relocation, led lighting, new fan to existing venting.Details
unit #515w bathroom remodel - no new wall and no existing wall relocation, led lighting, new fan to existing venting. | $12,000 |
| Dec 4, 2013 | Completed final sign-off Mar 2014 | 1322 07th Av | (1) bathroom remodel & replace entry doors and living room wet bar. all work in kind.Details
(1) bathroom remodel & replace entry doors and living room wet bar. all work in kind. | $20,000 |
| Dec 4, 2013 | Completed final sign-off May 2014 | 2201 Sacramento St | one kitchen remodel non structuralDetails
one kitchen remodel non structural | $35,000 |
| Oct 21, 2013 | Completed final sign-off May 2014 | 2901 Buchanan St | kitchen remodelDetails
kitchen remodel | $20,000 |
| Aug 16, 2013 | Completed final sign-off Nov 2013 | 1322 07th Av | see complaint to comply with compliant # 201316241 & 201316251. remodel (2) baths, (1) kitchen and paint interior (no moving of walls).Details
see complaint to comply with compliant # 201316241 & 201316251. remodel (2) baths, (1) kitchen and paint interior (no moving of walls). | $32,500 |
| Jun 6, 2013 | Completed final sign-off Oct 2013 | 2201 Sacramento St | kitchen remodel, guest bath remodel & master bath remodelDetails
kitchen remodel, guest bath remodel & master bath remodel | $41,000 |
| Jun 6, 2013 | Expired or cancelled expired Feb 2016 | 963 Avalon Av | bathroom remodelDetails
bathroom remodel | $6,500 |
| May 15, 2013 | Completed final sign-off May 2014 | 19 Ord St | revision to app#201202013328. 1st floor:remove bath and bay windows at east wall, add sliding door. 2nd floor: kitchen remainss in extg location, extg bay window remains. 3rd floor:remove window at shower, remove one window at east wall. roof: remove extg door, add sliding glass door.Details
revision to app#201202013328. 1st floor:remove bath and bay windows at east wall, add sliding door. 2nd floor: kitchen remainss in extg location, extg bay window remains. 3rd floor:remove window at shower, remove one window at east wall. roof: remove extg door, add sliding glass door. | $22,000 |
| Apr 9, 2013 | Completed final sign-off Jul 2013 | 101 Lombard St | 1 kitchen remodel. move electrical panel out of closet, install compliant lighting. light to comply with cec 150(k).Details
1 kitchen remodel. move electrical panel out of closet, install compliant lighting. light to comply with cec 150(k). | $21,000 |
| Apr 3, 2013 | Completed final sign-off Sep 2013 | 3675 19th St | to obtain final inspection for work approved under pa#201108192875. all work is complete.Details
to obtain final inspection for work approved under pa#201108192875. all work is complete. | |
| Feb 21, 2013 | Completed final sign-off Mar 2013 | 1335 Union St | light kitchen remodel, new electrical gfis, new cabinets, new countertops, 120 sq ftDetails
light kitchen remodel, new electrical gfis, new cabinets, new countertops, 120 sq ft | $15,000 |
| Oct 18, 2012 | Expired or cancelled expired Jul 2014 | 101 Lombard St | kitchen remodel- new cabinets, counters, water line for ice, adjust pipe locating for h/c water, new stops, new appliances, paint, new track light & d/r chandelier l/r & d/r, recessed cans i n kitchen, retexture walls & ceiling.Details
kitchen remodel- new cabinets, counters, water line for ice, adjust pipe locating for h/c water, new stops, new appliances, paint, new track light & d/r chandelier l/r & d/r, recessed cans i n kitchen, retexture walls & ceiling. | $35,000 |
| Apr 3, 2012 | Completed final sign-off Apr 2013 | 2201 Sacramento St | kitchen remodel- no moving walls, new cabinets, flooring, counters, lighting, move gas line to opposite side of kitchen, recessed lights, new appliances, upgrade electrical, run water line to refrigerator. at least 50% high efficacy lighting, cec150(k).Details
kitchen remodel- no moving walls, new cabinets, flooring, counters, lighting, move gas line to opposite side of kitchen, recessed lights, new appliances, upgrade electrical, run water line to refrigerator. at least 50% high efficacy lighting, cec150(k). | $15,000 |
| Apr 3, 2012 | Completed final sign-off Mar 2013 | 3639 19th St | kitchen remodel, laundry remodel- new cabinets, no moving walls, new counters, backsplash, lighting, refinish floors, new dishwasher & stove, upgrade plumbing & electrical in kitchen & laundry.Details
kitchen remodel, laundry remodel- new cabinets, no moving walls, new counters, backsplash, lighting, refinish floors, new dishwasher & stove, upgrade plumbing & electrical in kitchen & laundry. | $20,000 |
| Feb 1, 2012 | Completed final sign-off Oct 2013 | 19 Ord St | 1st floor: new bath, convert space behind garage to conditioned space for home gym. new windows at rear yard. 2nd fl: renovate kitchen/bath, replace bay window at front, new windows rear. 3rd fl: renovate bath, new windows. changes and new guardrails at existing decks at 2nd, 3rd, an roof levelsDetails
1st floor: new bath, convert space behind garage to conditioned space for home gym. new windows at rear yard. 2nd fl: renovate kitchen/bath, replace bay window at front, new windows rear. 3rd fl: renovate bath, new windows. changes and new guardrails at existing decks at 2nd, 3rd, an roof levels | $117,000 |
| Nov 7, 2011 | Completed final sign-off Mar 2012 | 358 Pacheco St | replace main breaker box(currenty fuses) install pan for w/d, repair damage wd. exterior decking, repair damage window sill, repair damage wd. in corner framing-restucco, relocate electrical line for tv, install cable/internet box for tv. install gutte cover for driveway access.Details
replace main breaker box(currenty fuses) install pan for w/d, repair damage wd. exterior decking, repair damage window sill, repair damage wd. in corner framing-restucco, relocate electrical line for tv, install cable/internet box for tv. install gutte cover for driveway access. | $7,500 |
| Nov 7, 2011 | Completed final sign-off Jan 2012 | 348 Church St | bathrm. remodel; build shower pan; install soffit above shower, run (n) dedicated line to bathrm., install gfci outlets, install shower lighting in soffitt above shower. install led recessed lighting, plumb shower w/2-independent shut-off's & shower heads install new vanity, toilet, recessed medicinDetails
bathrm. remodel; build shower pan; install soffit above shower, run (n) dedicated line to bathrm., install gfci outlets, install shower lighting in soffitt above shower. install led recessed lighting, plumb shower w/2-independent shut-off's & shower heads install new vanity, toilet, recessed medicin | $11,000 |
| Aug 19, 2011 | Expired or cancelled expired Sep 2013 | 3673 19th St | comply with nov# 201152433-front bldg-remove water damage stair treads & supports. repair with new treads framing & redwood treads. removal of rooftop deck, stairs work not to exceed 50% of total structureDetails
comply with nov# 201152433-front bldg-remove water damage stair treads & supports. repair with new treads framing & redwood treads. removal of rooftop deck, stairs work not to exceed 50% of total structure | $1,500 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 1930 Eddy St | in unit #104 1)kitchen remodel: new cabinets, counter flooring, sink, 50/50 title 24 lighting comply with cec 150 k. 2)bath remodel:new tub and tile surround, new tile floor, vanity and cabinets.3)new cabinetry in closet area.Details
in unit #104 1)kitchen remodel: new cabinets, counter flooring, sink, 50/50 title 24 lighting comply with cec 150 k. 2)bath remodel:new tub and tile surround, new tile floor, vanity and cabinets.3)new cabinetry in closet area. | $22,000 |
| Feb 3, 2011 | Completed final sign-off May 2011 | 298 Collingwood St | cosmetic kitchen remodel- new cabinets, granite, tile floors, light new appliances, paint at least 50% high efficacy lighting (no walls moved); bath remodel- new shower, install washer/dryer venting gas electrical, tile, paint, high efficacy or occupancy sensorDetails
cosmetic kitchen remodel- new cabinets, granite, tile floors, light new appliances, paint at least 50% high efficacy lighting (no walls moved); bath remodel- new shower, install washer/dryer venting gas electrical, tile, paint, high efficacy or occupancy sensor | $23,000 |
| Nov 10, 2010 | Completed final sign-off Jan 2011 | 1318 07th Av | kitchen remodel - new cabinets & counters, 50% high efficient lighting. two bathrooms remodel - new vanity, tile, lighting (occupancy sensor)- bathroom: floor refinishing, new window treatment & paint. no wall relocation. kitchen: at least 50% high efficacy - work will be at 1318 7th ave.Details
kitchen remodel - new cabinets & counters, 50% high efficient lighting. two bathrooms remodel - new vanity, tile, lighting (occupancy sensor)- bathroom: floor refinishing, new window treatment & paint. no wall relocation. kitchen: at least 50% high efficacy - work will be at 1318 7th ave. | $20,000 |
| Nov 9, 2010 | Completed final sign-off Feb 2011 | 355 Buena Vista East Av | kitchen remodel: new cabentry & countertops. (n) electrical upgrade from 80's (n) flooring. at least 50% high efficacy (he) lighting. bathroom: (n) vanity & toilet. he or occupancy sensor.Details
kitchen remodel: new cabentry & countertops. (n) electrical upgrade from 80's (n) flooring. at least 50% high efficacy (he) lighting. bathroom: (n) vanity & toilet. he or occupancy sensor. | $23,000 |
| Jul 8, 2010 | Never finaled issued Jul 2010, no final | 118 Cresta Vista Dr | remove existing top decking on rear deck and replace with new composite decking material. no structural workDetails
remove existing top decking on rear deck and replace with new composite decking material. no structural work | $2,000 |
| May 6, 2010 | Completed final sign-off Jul 2010 | 201 Central Av | kitchen remodel, update plumbing & electrical, new cabinets, granite counter with tile & back splash, under cabinet lighting, new sink, faucet, new tile floor, no structural changesDetails
kitchen remodel, update plumbing & electrical, new cabinets, granite counter with tile & back splash, under cabinet lighting, new sink, faucet, new tile floor, no structural changes | $8,500 |