Back to kitchen remodel contractors
B Y C Construction Inc.
- Based in
- San Leandro
- On San Francisco permits
- Jun 2006 to Jun 2026
- Last 24 months
- 3 permits filed
77 permits since 2000: 57 completed, 19 never finaled, 1 expired or cancelled.
Of the 19 never-finaled permits, 3 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2021 | Completed final sign-off Jun 2021 | 354 Sweeny St | demolition of old cabinets & install new cabinets & new sheetrock. install several gfi & some plumbing work. kitchen work only.Details
demolition of old cabinets & install new cabinets & new sheetrock. install several gfi & some plumbing work. kitchen work only. | $25,000 |
| Jan 11, 2019 | Completed final sign-off Apr 2019 | 1890 43rd Av | remove existing kitchen cabinets, sink, and install re-finished used kitchen cabinets w/new sinks. and install new (1) gfi plug, and replace old plumbing pipe. re-use no change in existing appliances.Details
remove existing kitchen cabinets, sink, and install re-finished used kitchen cabinets w/new sinks. and install new (1) gfi plug, and replace old plumbing pipe. re-use no change in existing appliances. | $7,600 |
| Mar 25, 2011 | Completed final sign-off May 2011 | 239 Brannan St | demo bathroom. new tub,plbg fixtures, tile floor, new counter. new kitchen counter top, plmbg fixtures.Details
demo bathroom. new tub,plbg fixtures, tile floor, new counter. new kitchen counter top, plmbg fixtures. | $11,000 |
| Nov 12, 2010 | Completed final sign-off Jun 2011 | 2111 Hyde St | demo, framing, plumbing, elec.-add laundry, minor alteration of two bathrooms, new kitchen cabinets and appliances; no structuralDetails
demo, framing, plumbing, elec.-add laundry, minor alteration of two bathrooms, new kitchen cabinets and appliances; no structural | $110,000 |