Back to bathroom remodel contractors
B W H Builder Inc.
- Based in
- Daly City
- On San Francisco permits
- May 2007 to Jan 2026
- Last 24 months
- 5 permits filed
103 permits since 2000: 85 completed, 1 in progress, 14 never finaled, 3 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
46 bathroom remodel permits: 39 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off Sep 2026 | 221 Magellan Av | kitchen relocation and remodeling. add 1 new bath. propose 1 new electrical fireplace like for like. replace all windows. replace furnace and water heater.Details
kitchen relocation and remodeling. add 1 new bath. propose 1 new electrical fireplace like for like. replace all windows. replace furnace and water heater. | $125,000 |
| Jun 10, 2025 | Completed final sign-off Jul 2025 | 1838 Fell St | replace all cabinets, counter tops. cabinets located at same area. renovate bathroom. keep an (e) bathtub as it is. add sub panel.Details
replace all cabinets, counter tops. cabinets located at same area. renovate bathroom. keep an (e) bathtub as it is. add sub panel. | $50,000 |
| Oct 30, 2023 | Completed final sign-off Dec 2023 | 220 Gellert Dr | full bathroom renovation, replace toilet, vanity, redo shower, replacement of lights.Details
full bathroom renovation, replace toilet, vanity, redo shower, replacement of lights. | $23,000 |
| Oct 19, 2023 | Completed final sign-off Jan 2024 | 350 West Portal Av | construction of one unisex toilet room as barrier removal of (e) non compliant bathroom. main floor area removal of cabinetryDetails
construction of one unisex toilet room as barrier removal of (e) non compliant bathroom. main floor area removal of cabinetry | $10,000 |
| Sep 14, 2023 | Completed final sign-off Oct 2023 | 220 Gellert Dr | remodel 1 bathroom on 2nd fl. remodel 1 bathroom at 1st fl. replace fixtures in existing place. 2 bathrooms total.Details
remodel 1 bathroom on 2nd fl. remodel 1 bathroom at 1st fl. replace fixtures in existing place. 2 bathrooms total. | $43,500 |
| Jun 30, 2023 | Completed final sign-off Mar 2024 | 60 Clairview Ct | ground flr: add family room with kitchenette, 2 bedrooms, laundry closet, and full bathroom behind 2-car garage. replace furnace and water heater. remain a single-family.Details
ground flr: add family room with kitchenette, 2 bedrooms, laundry closet, and full bathroom behind 2-car garage. replace furnace and water heater. remain a single-family. | $100,000 |
| Feb 17, 2023 | Completed final sign-off Jul 2023 | 730 Florida St | full kichen renovation. all applliances and sink at same location. 1/2 bath room renovation . keep a vanity and toilet at same placeDetails
full kichen renovation. all applliances and sink at same location. 1/2 bath room renovation . keep a vanity and toilet at same place | $43,250 |
| Dec 9, 2022 | Never finaled issued Dec 2022, no final | 1840 Fell St | 1840a fell street: one full remodeling a bathroom and one kitchen but all electrical and plumbing fixtures stay as existing location.Details
1840a fell street: one full remodeling a bathroom and one kitchen but all electrical and plumbing fixtures stay as existing location. | $48,569 |
| Oct 21, 2022 | Completed final sign-off Mar 2023 | 2118 34th Av | ground fl - remodel full bath; add kitchenette; replace 10 windows, 2 of which are street facing & 1 sliding door; replace furnace w/packaged furnace/air conditioning unit. add plywood to g/f walls.Details
ground fl - remodel full bath; add kitchenette; replace 10 windows, 2 of which are street facing & 1 sliding door; replace furnace w/packaged furnace/air conditioning unit. add plywood to g/f walls. | $60,000 |
| Dec 28, 2020 | Completed final sign-off Apr 2021 | 1846 Fell St | remodeling bathroom & kitchen but all locations stay as (e) locations. install new electrical panel at hallway.Details
remodeling bathroom & kitchen but all locations stay as (e) locations. install new electrical panel at hallway. | $35,000 |
| Dec 28, 2020 | Completed final sign-off Feb 2021 | 1842 Fell St | remodeling bathroom & kitchen but all locations stay as (e) locations. install new electrical panel at hallway.Details
remodeling bathroom & kitchen but all locations stay as (e) locations. install new electrical panel at hallway. | $35,000 |
| Aug 28, 2020 | Completed final sign-off Oct 2020 | 1840 Fell St | kitchen and bathroom remodel at same location. install new subpanel.Details
kitchen and bathroom remodel at same location. install new subpanel. | $36,000 |
| Aug 28, 2020 | Completed final sign-off Oct 2020 | 1844 Fell St | kitchen and bathroom remodel at same location. install new subpanel.Details
kitchen and bathroom remodel at same location. install new subpanel. | $36,000 |
| Dec 23, 2019 | Completed final sign-off Feb 2020 | 1842 Fell St | apt a: remodel kitchen (replacement of cabinets, floor tiles, countertop painting) & bathroom (replacememt of floor tiles, wash tiles, replacement of tiolet, vanity and keep tub as-is).Details
apt a: remodel kitchen (replacement of cabinets, floor tiles, countertop painting) & bathroom (replacememt of floor tiles, wash tiles, replacement of tiolet, vanity and keep tub as-is). | $31,000 |
| Mar 27, 2019 | Completed final sign-off May 2019 | 1838 Fell St | #a: renovation of small kitchen, replacement of cabinets counter tops. renovation of bathroom, replacement of bathtub, vanity, toilet, all fixtures in same location.Details
#a: renovation of small kitchen, replacement of cabinets counter tops. renovation of bathroom, replacement of bathtub, vanity, toilet, all fixtures in same location. | $30,000 |
| Jan 8, 2019 | Completed final sign-off May 2019 | 40 Northwood Dr | rebuild interior staircase ground fl. add family room, entertainment room, bedroom & 2 full bathrooms. maher n/a.Details
rebuild interior staircase ground fl. add family room, entertainment room, bedroom & 2 full bathrooms. maher n/a. | $110,000 |
| Dec 4, 2018 | Completed final sign-off Oct 2019 | 4839 Anza St | 2nd fl: relocate kitchen, remodel bath, demolish rear staircase. gr fl add 2 bedrooms and full bathDetails
2nd fl: relocate kitchen, remodel bath, demolish rear staircase. gr fl add 2 bedrooms and full bath | $70,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2017 | 842 Portola Dr | renovation of bathroom on 2/f.Details
renovation of bathroom on 2/f. | $12,000 |
| Aug 3, 2017 | Completed final sign-off Mar 2018 | 401 Ramsell St | 2nd flr: create open flr plan for living room, dining room, & kitchen. reconfigure & remodel kitchen. convert bathrm to master bath, add full bath, demolish interior stairs, replace 8 windows. ground floor: convert 2 car garage to 1 car; add play room, bedroom, office and full bath; replace 2 wndwsDetails
2nd flr: create open flr plan for living room, dining room, & kitchen. reconfigure & remodel kitchen. convert bathrm to master bath, add full bath, demolish interior stairs, replace 8 windows. ground floor: convert 2 car garage to 1 car; add play room, bedroom, office and full bath; replace 2 wndws | $95,000 |
| Mar 10, 2017 | Never finaled issued Apr 2017, no final | 1710 38th Av | new family room & bathroom at garage shell spaceDetails
new family room & bathroom at garage shell space | $25,000 |
| Mar 6, 2017 | Completed final sign-off Jul 2018 | 37 Sanchez St | revision to 201608044176: reduction in scope. no structural work interior remodel, replace (e) side windows, new window added to side - not visible, revised kitchen remodel, revised bath no floor area addedDetails
revision to 201608044176: reduction in scope. no structural work interior remodel, replace (e) side windows, new window added to side - not visible, revised kitchen remodel, revised bath no floor area added | |
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 145 Colby St | renovation of kitchen and bathroom at 2nd floor. no walls to be removed and all appliances keep as same locationsDetails
renovation of kitchen and bathroom at 2nd floor. no walls to be removed and all appliances keep as same locations | $40,000 |
| Aug 4, 2016 | Completed final sign-off Jul 2018 | 37 Sanchez St | interior & exterior remodel - exterior wrok to side & back only to match (e) conditions as much as possible. interior work to kitchen, bath, bedroom. living room no sf added, windows to be alum clad wood & all new siding to match (e).Details
interior & exterior remodel - exterior wrok to side & back only to match (e) conditions as much as possible. interior work to kitchen, bath, bedroom. living room no sf added, windows to be alum clad wood & all new siding to match (e). | $100,000 |
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 2158 35th Av | remodel (e) ground floor family room from new master suite & office. master suite includes: new closet, bathroom, (e) powder room to remain. replace rear window & exterior door w/same width, new hgt units, (e) stair to remain, replace sould wall railing with open rail, replace w/h w/on demand unit.Details
remodel (e) ground floor family room from new master suite & office. master suite includes: new closet, bathroom, (e) powder room to remain. replace rear window & exterior door w/same width, new hgt units, (e) stair to remain, replace sould wall railing with open rail, replace w/h w/on demand unit. | $61,000 |
| Jun 15, 2016 | Completed final sign-off Aug 2016 | 17 Gellert Dr | renovate kitchen & bathroom, no walls added/removed.Details
renovate kitchen & bathroom, no walls added/removed. | $32,500 |
| Nov 13, 2015 | Completed final sign-off Aug 2016 | 1669 15th Av | kitchen & bath remodel, new habitable space at (e) shell at upper basement, new site stair to 15th avenue.Details
kitchen & bath remodel, new habitable space at (e) shell at upper basement, new site stair to 15th avenue. | $130,000 |
| Sep 23, 2015 | Completed final sign-off Oct 2015 | 587 28th Av | renovation of upstairs bathroom. no change in wall and opening layout. high eficacy lighting or controlled by manual on sensor with high efficacy main light.Details
renovation of upstairs bathroom. no change in wall and opening layout. high eficacy lighting or controlled by manual on sensor with high efficacy main light. | $10,000 |
| Jun 23, 2015 | Never finaled issued Jun 2015, no final | 1508 Quesada Av | replace all plumbing and electrical fixtures, replace toilets. a vanity keeps a shower pan install new tiles. bathroom is 40 sq ft. no walls moved, removed or added. all existing layout to remain unchanged.Details
replace all plumbing and electrical fixtures, replace toilets. a vanity keeps a shower pan install new tiles. bathroom is 40 sq ft. no walls moved, removed or added. all existing layout to remain unchanged. | $10,000 |
| Oct 29, 2014 | Never finaled issued Oct 2014, no final | 2036 22nd St | #3: single full bathroom remodeling. no changes on walls.Details
#3: single full bathroom remodeling. no changes on walls. | $10,000 |
| Aug 25, 2014 | Completed final sign-off Jan 2015 | 226 Moscow St | remodeling a bathroom and laundry room at ground floor. legalize office.Details
remodeling a bathroom and laundry room at ground floor. legalize office. | $21,999 |
| Jun 25, 2014 | Completed final sign-off May 2015 | 154 22nd Av | horizontal addition at 1/f at rear - room infill under the extg 2nd floor. and remodel 1 adjacent bathroom. no work on 2/f.Details
horizontal addition at 1/f at rear - room infill under the extg 2nd floor. and remodel 1 adjacent bathroom. no work on 2/f. | $31,999 |
| Jan 14, 2014 | Completed final sign-off Feb 2014 | 104 Point Lobos Av | bathroom remodeling. 1. new shower pan, new toilet, new vanity, new tiles, new lights. work is on mid-level of bldg. bathroom lighting shall be high efficacy or control by manuel on sensor.Details
bathroom remodeling. 1. new shower pan, new toilet, new vanity, new tiles, new lights. work is on mid-level of bldg. bathroom lighting shall be high efficacy or control by manuel on sensor. | $10,000 |
| Sep 19, 2013 | Completed final sign-off Oct 2013 | 1710 38th Av | remodeling entire bathroom and kitchen, replace cabinets, install new plumbing fixtures, install countertops, install tiles, install new led re cessed lgihts, install new appliances, install new bathtub, vanity and toilets.Details
remodeling entire bathroom and kitchen, replace cabinets, install new plumbing fixtures, install countertops, install tiles, install new led re cessed lgihts, install new appliances, install new bathtub, vanity and toilets. | $25,999 |
| Dec 3, 2012 | Completed final sign-off Mar 2013 | 320 Ocean Av | convert 2nd floor storage room into full bathroom. increase the size of the main water pipeDetails
convert 2nd floor storage room into full bathroom. increase the size of the main water pipe | $13,000 |
| Oct 29, 2012 | Completed final sign-off Nov 2012 | 314 Willard North St | full remodel entire bathroom, lighting shall comply with title 24Details
full remodel entire bathroom, lighting shall comply with title 24 | $12,500 |
| Aug 10, 2012 | Completed final sign-off Sep 2012 | 374 31st Av | remodel kitchen:replace all cabinets,appliances, install tile floor and seven recessed lights. remodel entire bathroom. replace all fixtures, install floor and wall tiles. paint interior house.Details
remodel kitchen:replace all cabinets,appliances, install tile floor and seven recessed lights. remodel entire bathroom. replace all fixtures, install floor and wall tiles. paint interior house. | $24,500 |
| Jul 6, 2012 | Completed final sign-off Oct 2012 | 3636 17th St | full bathroom remodel, removed partial wall between kitchen & dining room. remove wall at bathroom between hallway, remove wall at bedroom/living room between hallway.Details
full bathroom remodel, removed partial wall between kitchen & dining room. remove wall at bathroom between hallway, remove wall at bedroom/living room between hallway. | $14,599 |
| Aug 26, 2011 | Completed final sign-off May 2012 | 2431 15th Av | legalize bath & bedroom at ground floor. fully remodeling two baths, entire kitchen & remove partition at 2nd floor, replace windows at 1st & 2nd floor. install new ceiling recessed lights at dining & living room area. replace water heater & furnace. remove partition wall @ kitchen area.Details
legalize bath & bedroom at ground floor. fully remodeling two baths, entire kitchen & remove partition at 2nd floor, replace windows at 1st & 2nd floor. install new ceiling recessed lights at dining & living room area. replace water heater & furnace. remove partition wall @ kitchen area. | $65,000 |
| Jul 13, 2011 | Completed final sign-off Feb 2012 | 155 Wood St | front bldg. revision to pa# 2010.11.18.5181. new tankless water heater installation at 1st and 2nd floor. repair/replace dry rotter/damaged wall in garage, revised layout of approved bathroom at 2nd fl.interior stair to tattic to remainDetails
front bldg. revision to pa# 2010.11.18.5181. new tankless water heater installation at 1st and 2nd floor. repair/replace dry rotter/damaged wall in garage, revised layout of approved bathroom at 2nd fl.interior stair to tattic to remain | $6,000 |
| Jun 29, 2011 | Completed final sign-off Nov 2011 | 358 30th Av | 1)convert play room to bedroom.2)build a new closet at bedroom.3)install an new shower pan 3'x3'.4)install the shower pan glass panel and a glass door (tempered glass) 5) remove a portion of extg 1/2 bath wall as shown on the plan. 6) install the floor tiling's & wall tiling's.Details
1)convert play room to bedroom.2)build a new closet at bedroom.3)install an new shower pan 3'x3'.4)install the shower pan glass panel and a glass door (tempered glass) 5) remove a portion of extg 1/2 bath wall as shown on the plan. 6) install the floor tiling's & wall tiling's. | $6,500 |
| Jun 2, 2011 | Completed final sign-off Jul 2011 | 2009 21st Av | demo (e) front brick staircase & disposal, demo (e) staircase structure & disposal, new 3 pieces of carriages, new 3/4 p.t sub treads & sub risers. new rough surface of stone treads & risers, sheetrock fire tap & mud under stairwy of triangle area. legalize (e) ground floor rooms & bathroomDetails
demo (e) front brick staircase & disposal, demo (e) staircase structure & disposal, new 3 pieces of carriages, new 3/4 p.t sub treads & sub risers. new rough surface of stone treads & risers, sheetrock fire tap & mud under stairwy of triangle area. legalize (e) ground floor rooms & bathroom | $7,500 |
| Apr 13, 2011 | Completed final sign-off Aug 2011 | 312 Pioche St | revision to 201102170435. correct address from 300 pioche to 312 pioche.legalize 2 bedrooms and 1 full bath. remove 2nd garage door, return curb, add window at front. remove illegal kitchen and bedroom, convert back to garage. add cabinetsDetails
revision to 201102170435. correct address from 300 pioche to 312 pioche.legalize 2 bedrooms and 1 full bath. remove 2nd garage door, return curb, add window at front. remove illegal kitchen and bedroom, convert back to garage. add cabinets | $7,500 |
| Feb 17, 2011 | Expired or cancelled cancelled Aug 2011 | 300 Pioche St | remove (e) cabinets & sink in basement (garage) floor, remove 2 (e) walls in basement (garage) floor. cap (e) plumbing pipes at kitchen area & cap (e) electrical wire at kitchen area. kitchen to be removed. legalize (e) bathroomDetails
remove (e) cabinets & sink in basement (garage) floor, remove 2 (e) walls in basement (garage) floor. cap (e) plumbing pipes at kitchen area & cap (e) electrical wire at kitchen area. kitchen to be removed. legalize (e) bathroom | $3,500 |
| Jun 11, 2009 | Completed final sign-off Sep 2009 | 1353 23rd Av | add new bathroom at main bedroom of 2nd floor, legalize living room bedroom & bathroom at basement floor. replace water heater & furnaceDetails
add new bathroom at main bedroom of 2nd floor, legalize living room bedroom & bathroom at basement floor. replace water heater & furnace | $8,250 |
| May 22, 2009 | Expired or cancelled expired Feb 2012 | 1353 23rd Av | new hardwood floor, replace windows and doors,reinstallation of kitchen cabinets. remodeling bathroom. same size as existing for the windows and doors. u <0.67. provide h.e light per title 24Details
new hardwood floor, replace windows and doors,reinstallation of kitchen cabinets. remodeling bathroom. same size as existing for the windows and doors. u <0.67. provide h.e light per title 24 | $67,750 |
| May 1, 2007 | Never finaled issued May 2007, no final | 1 Crescent Wy | work @ unit# 1115 only. 48 sq. ft. bathroom marble floor & 400 sq. ft. family room hardwood floor renovation.Details
work @ unit# 1115 only. 48 sq. ft. bathroom marble floor & 400 sq. ft. family room hardwood floor renovation. | $7,000 |