Back to kitchen remodel contractors
B&I Modernconstr.Inc/Dba Bi Qualty Pntng
- Based in
- Pleasant Hill
- On San Francisco permits
- Feb 2014 to Apr 2026
- Last 24 months
- 5 permits filed
38 permits since 2000: 27 completed, 3 in progress, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 15 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2025 | In progress issued May 2025 | 2790 19th Av | unit 14 bldg 1: carpet replacement, kitchen cabinets updates, countertop, recessed lighting, bathroom remodeling (2), tile work, bath tub, shower pan, vanity cabinets, painting, no wall removal/construction, no change in plumbing fixture count.Details
unit 14 bldg 1: carpet replacement, kitchen cabinets updates, countertop, recessed lighting, bathroom remodeling (2), tile work, bath tub, shower pan, vanity cabinets, painting, no wall removal/construction, no change in plumbing fixture count. | $50,000 |
| Apr 7, 2025 | In progress issued Apr 2025 | 158 Lake Merced Hill St South St | demolish of kitchen cabinets. install new kitchen per layout. demo existing walls on the 1st floor between kichen and hallway. frame new floor about the entry.Details
demolish of kitchen cabinets. install new kitchen per layout. demo existing walls on the 1st floor between kichen and hallway. frame new floor about the entry. | $30,000 |
| Dec 23, 2024 | Completed final sign-off Mar 2025 | 481 Clipper St | unit 481 clipper, kitchen remodeling: demolitsh existing cabinets and counter top. install new cabinets and countertop, painting work, plmbing & electrical work. no any demolition or removal of walls.Details
unit 481 clipper, kitchen remodeling: demolitsh existing cabinets and counter top. install new cabinets and countertop, painting work, plmbing & electrical work. no any demolition or removal of walls. | $25,000 |
| Dec 11, 2023 | Completed final sign-off Jul 2024 | 231 Gates St | water damage to reinstall 5 kitchen cabinets and appliances. no change walls. for water damaged. kitchen remodel work was completed under appl. # 201902213466.Details
water damage to reinstall 5 kitchen cabinets and appliances. no change walls. for water damaged. kitchen remodel work was completed under appl. # 201902213466. | $7,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 373 26th Av | kitchen remodel. paint, plumbing, electrical, cabinet, floor.Details
kitchen remodel. paint, plumbing, electrical, cabinet, floor. | $15,000 |
| Mar 9, 2021 | Completed final sign-off Jun 2021 | 2741 Taraval St | kitchen(200 sq ft) and bathroom(100sq ft) remodeling like to like: plumbing, electrical, tile, painting, cabinets, countertop. walls are not moving.Details
kitchen(200 sq ft) and bathroom(100sq ft) remodeling like to like: plumbing, electrical, tile, painting, cabinets, countertop. walls are not moving. | $30,000 |
| Feb 5, 2021 | Completed final sign-off Sep 2021 | 666 Post St | #904: 1 kitchen & 1 bathroom remodel: renovate unit. rewire (e) outlets, switches, modify plumbing for kitchen & bathroom. installation of kitchen cabinets, tile, vanity, drywall. painting. no new walls & no existing wall relocation, no wallls removed. new lighting shall comply w/cec 150.0(k).Details
#904: 1 kitchen & 1 bathroom remodel: renovate unit. rewire (e) outlets, switches, modify plumbing for kitchen & bathroom. installation of kitchen cabinets, tile, vanity, drywall. painting. no new walls & no existing wall relocation, no wallls removed. new lighting shall comply w/cec 150.0(k). | $40,000 |
| Dec 28, 2020 | Completed final sign-off Dec 2023 | 58 Lake Forest Ct | provide one new accessory dwelling unit at ground floor of existing single family home. existing habitable space will be converted into an adu within the existing building envelope. an existing home office will be converted to a kitchen within the proposed adu space.Details
provide one new accessory dwelling unit at ground floor of existing single family home. existing habitable space will be converted into an adu within the existing building envelope. an existing home office will be converted to a kitchen within the proposed adu space. | $21,000 |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 255 Berry St | unit 111: remodeling kitchen & bathroom, drywall, cabinets, tile, paintingDetails
unit 111: remodeling kitchen & bathroom, drywall, cabinets, tile, painting | $25,000 |
| Jan 11, 2017 | Completed final sign-off Mar 2017 | 240 Lombard St | kitchen & bathroom remodeling: kitchen - replace cabinets, counter top, connect to existing ws. bathroom demolition, replace faucet, bath tub & tile. no elelctrical, no mech works.Details
kitchen & bathroom remodeling: kitchen - replace cabinets, counter top, connect to existing ws. bathroom demolition, replace faucet, bath tub & tile. no elelctrical, no mech works. | $10,000 |
| Jun 7, 2016 | Completed final sign-off Nov 2017 | 2 Fallon Pl | unit 28 - remove non bearing partition walls, demo of kitchen & bathroom. replace windows, kitchen & bathroom remodeling. windows u factor 0.58 maximum. lighting shall comply with cec 150.0 (k) requirements.Details
unit 28 - remove non bearing partition walls, demo of kitchen & bathroom. replace windows, kitchen & bathroom remodeling. windows u factor 0.58 maximum. lighting shall comply with cec 150.0 (k) requirements. | $41,000 |
| May 12, 2016 | Completed final sign-off Nov 2016 | 941 Vallejo St | apt 78: kitchen remodeling. demo/modify electircal, plumbing. painting. replace cabinets & counters like for like. no removal/addition/relocation of walls.Details
apt 78: kitchen remodeling. demo/modify electircal, plumbing. painting. replace cabinets & counters like for like. no removal/addition/relocation of walls. | $12,000 |
| May 5, 2016 | Expired or cancelled cancelled Jun 2016 | 1 Daniel Burnham Ct | kitchen remodel: demolition of old cabinets, install new. modify electrical and plumbing layouts.Details
kitchen remodel: demolition of old cabinets, install new. modify electrical and plumbing layouts. | $8,000 |
| Oct 1, 2015 | Completed final sign-off Jul 2016 | 941 Vallejo St | #36 - remodel kitchen & 1 bathroom; exhaust fan to remain. replace electrical tankless water heater. recessed lights (led), new electrical panel installation.Details
#36 - remodel kitchen & 1 bathroom; exhaust fan to remain. replace electrical tankless water heater. recessed lights (led), new electrical panel installation. | $15,000 |
| Jul 2, 2015 | Completed final sign-off Feb 2016 | 850 Powell St | unit #104 only: interior remodel of apt incuding new bathroom, reconfiguration of master suite , kitchen, and bathrooms.Details
unit #104 only: interior remodel of apt incuding new bathroom, reconfiguration of master suite , kitchen, and bathrooms. | $35,000 |
| Jun 22, 2015 | Never finaled issued Jul 2015, no final | 850 Powell St | unit #104:interior demolition in kitchen and baths only. no exterior work.kitchen and bath remodel tp follow on seperate permit. no removal of fire resistance rated wall finishes or assemblies.Details
unit #104:interior demolition in kitchen and baths only. no exterior work.kitchen and bath remodel tp follow on seperate permit. no removal of fire resistance rated wall finishes or assemblies. | $10,000 |
| May 6, 2015 | Completed final sign-off Sep 2015 | 2 Fallon Pl | kitchen and bath remodel. kitchen disconnect waterheater, install drain pan, reinstall water heater. bath: demo tile, new tile, vanity, water closet. no walls to be removed, non strucuralDetails
kitchen and bath remodel. kitchen disconnect waterheater, install drain pan, reinstall water heater. bath: demo tile, new tile, vanity, water closet. no walls to be removed, non strucural | $16,000 |
| Oct 29, 2014 | Completed final sign-off Aug 2015 | 1234 34th Av | kitchen remodel. demo and installaton of cabinets, plumbing elecDetails
kitchen remodel. demo and installaton of cabinets, plumbing elec | $12,000 |
| Oct 3, 2014 | Completed final sign-off Mar 2015 | 1236 34th Av | remodel bath on 3rd fl. shower area converted to washer dryer laundry. shower moved to combined shower tub. bath led lighting. kitchen remodel. demo and install cabinets, pluming, tile. no change to walls and openings. kitchen 50% lighting, wattage hi effDetails
remodel bath on 3rd fl. shower area converted to washer dryer laundry. shower moved to combined shower tub. bath led lighting. kitchen remodel. demo and install cabinets, pluming, tile. no change to walls and openings. kitchen 50% lighting, wattage hi eff | $20,000 |
| Mar 11, 2014 | Completed final sign-off Apr 2014 | 900 Bush St | demolition of kitchen cabinets. install new ones, connect fixtures to existing water line, provide new outlet receptacles, no lighting work, exhaust connect to (e) duct; compliance with ord. 155-13 not requiredDetails
demolition of kitchen cabinets. install new ones, connect fixtures to existing water line, provide new outlet receptacles, no lighting work, exhaust connect to (e) duct; compliance with ord. 155-13 not required | $7,500 |