Back to kitchen remodel contractors
B Fong Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Apr 2013
- Last 24 months
- 0 permits filed
22 permits since 2000: 18 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2013 | Never finaled issued Apr 2013, no final | 1044 Shrader St | replace kitchen cabinet & counterops. change vinyl floor to wood floor. replace kitchen door in back, same size & location.Details
replace kitchen cabinet & counterops. change vinyl floor to wood floor. replace kitchen door in back, same size & location. | $25,800 |
| Sep 14, 2007 | Completed final sign-off Dec 2008 | 2650 43rd Av | construct a 2-story addition to the rear of the building for (n) family room , (n)bathroom on 1st fl and (n) living room and kitchen exoansion on the 2nd floor.Details
construct a 2-story addition to the rear of the building for (n) family room , (n)bathroom on 1st fl and (n) living room and kitchen exoansion on the 2nd floor. | $130,000 |
| Nov 28, 2006 | Completed final sign-off Jun 2007 | 39 Riverton Dr | proposed alterationand remodel existing g/f and 2nd fl, install bedroom, bath, family rm at g/f. replace dryrot damaged siding at rear building. entire rear wall n wood siding. n bath 2nd floor, remodel kitchen and e bathDetails
proposed alterationand remodel existing g/f and 2nd fl, install bedroom, bath, family rm at g/f. replace dryrot damaged siding at rear building. entire rear wall n wood siding. n bath 2nd floor, remodel kitchen and e bath | $67,000 |
| Mar 11, 2004 | Completed final sign-off Jul 2004 | 550 25th Av | remove all old plaster install all new sheetrock insulation, new bathrm & kitchen remodel, new cabsDetails
remove all old plaster install all new sheetrock insulation, new bathrm & kitchen remodel, new cabs | $65,000 |
| Sep 5, 2003 | Completed final sign-off Dec 2003 | 1582 16th Av | remodel kitchen & bath, change kitchen cabinet/counter top, bath faucet/tile/sink, fix walkin closetDetails
remodel kitchen & bath, change kitchen cabinet/counter top, bath faucet/tile/sink, fix walkin closet | $15,000 |
| Nov 13, 2001 | Expired or cancelled expired May 2002 | 3922 Clay St | change the bathroom wall tile and floor tile. new kitchen cbnt and cntrtop remove front garden dirtDetails
change the bathroom wall tile and floor tile. new kitchen cbnt and cntrtop remove front garden dirt | $16,000 |