Back to kitchen remodel contractors
B & E Restoration
- Based in
- Napa
- On San Francisco permits
- May 2014 to Jun 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2014 | Never finaled issued May 2014, no final | 2763 Mcallister St | replace drywall, trim work & flooring (kitchen, hall, dining, shower, toilet & hall closet areas). maintain fire resistive const. no structural work under this permitDetails
replace drywall, trim work & flooring (kitchen, hall, dining, shower, toilet & hall closet areas). maintain fire resistive const. no structural work under this permit | $12,000 |
| May 15, 2014 | Completed final sign-off Feb 2015 | 2765 Mcallister St | replace drywall, trim work and flooring (1/2 studio, hall kitchen, bathroom and shower). maintain fire resistive construction.Details
replace drywall, trim work and flooring (1/2 studio, hall kitchen, bathroom and shower). maintain fire resistive construction. | $12,000 |