B B Design Build
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to May 2011
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 20 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2011 | Completed final sign-off May 2011 | 436 Sanchez St | take down existing lathe and plaster along stair way (220 sq ft), and take dow lathe and plaster above stairway (144 sq ft). replace with 5/8"gypsum. all work in kind.Details
take down existing lathe and plaster along stair way (220 sq ft), and take dow lathe and plaster above stairway (144 sq ft). replace with 5/8"gypsum. all work in kind. | $3,200 |